Laserfiche WebLink
Prof.Survey Survey Survey Survey CAD Total <br />Surveyor Proj. Mgr. Party Chief Technician Technician Hours <br />1 12 13 <br />2 2 <br />0 <br />2 2 <br />0 <br />6 5 5 16 <br />0 <br />0 <br />2 2 4 <br />24 24 48 <br />6 6 12 <br />2 2 4 <br />6 10 16 <br />0 <br />4 4 <br />0 <br />0 <br />1 2 4 7 <br />0 <br />4 4 8 <br />3 5 8 <br />5 39 43 43 14 144 <br />$225.32 $128.72 $93.24 $70.74 $88.47 <br />$1,126.60 $5,020.08 $4,009.32 $3,041.82 $1,238.58 $14,436.40 <br />$14,436.40 <br />Mileage:2 trips at 297 miles at 0.45$per mile $267.30 <br />Meal:2 persons for 4 days at 35.00$per day $280.00 <br />Lodging:2 persons for 3 nights at 96.00$per night $576.00 <br />Copies:copies at per copy $0.00 <br />Deed Research:deeds at $0.00 <br />$0.00 <br />$1,123.30 <br />$15,559.70 <br />$15,600.00PROPOSED LUMP SUM FEE <br />ESTIMATED HOURS <br />HOURLY JUSTIFICATION, SURVEY <br />Muessel / Holy Cross SRTS; Des 1900447 - Supplemental Survey <br />South Bend, St. Joseph County <br />PAGE 1 OF 1 <br />WORK ELEMENT <br />Project Horizontal Control <br />Run Level Circuit <br />Topographic Survey <br />Detail Structures <br />SURVEY <br />Send Survey Notices <br />Interview Land Owners <br />Set & Locate Mobile LiDAR Targets <br />Locate Monuments <br />Request Utility Locations <br />Preperation and Initial Research <br />TOTAL HOURS <br />HOURLY RATE <br />Sewer Structure Details <br />Download & Draft Topography <br />Determine Alignment Location <br />Determine Boundaries <br />Set & Reference Alignment <br />GPS Horizontal Control <br />TOTAL FEE FOR LABOR <br />Set & Reference Section Corners <br />Complete Field Book Information <br />Prepare Location Control Route Survey <br />Travel Time <br />Supervision <br />Total Direct Cost <br />Total Other Direct Cost <br />TOTAL PROJECT COSTS <br />OTHER SURVEY DIRECT PROJECT COSTS <br />Record LCRSP