My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 1 to OEA - WWTP DAF Building Improvement Proj No. 123-031 - Black & Veatch
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No 1 to OEA - WWTP DAF Building Improvement Proj No. 123-031 - Black & Veatch
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 3:31:08 PM
Creation date
4/9/2024 3:31:04 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
4/9/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> Page 2 <br />(Exhibit K – (Amendment to Owner-Engineer Agreement) – Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br /> <br />Engineer will provide a cost analysis comparing two different polymer systems; dry and <br />emulsion. Engineer will analyze estimated capital cost at a budgetary level, based on <br />preliminary design information, and 20-year chemical cost. Engineer will also work with <br />vendors to determine feasibility of each type of polymer. Results will be documented in a <br />memorandum and the City will provide direction before design commences. <br /> <br />Task 204 – Shop Drawing and Submittal Review <br /> <br />Engineer will review shop drawings and other data submitted by the Contractor for the <br />polymer equipment and associated appurtenances. The Engineer’s review shall be for <br />general conformity to the Construction Contract Documents for the project and shall not <br />relieve the Contractor of any of their contractual responsibilities. <br /> <br /> <br />b. The Scope of Services currently authorized to be performed by Engineer in <br />accordance with the Agreement and previous amendments, if any, is modified as <br />follows: <br /> <br />c. The responsibilities of Owner are modified as follows: <br /> <br />d. For the Additional Services or the modifications to services set forth above, <br />Owner shall pay Engineer the following additional or modified compensation: <br /> <br />e. The schedule for rendering services is modified as follows: <br /> <br /> <br />f. Other portions of the Agreement (including previous amendments, if any) are <br />modified as follows: <br /> <br /> <br /> <br /> <br /> <br />5. Agreement Summary (Reference only) <br /> a. Original Agreement amount: $_528,642_ ____ <br /> b. Net change for prior amendments: $_0_______________ <br /> c. This amendment amount: $__69,585__________ <br /> d. Adjusted Agreement amount: $_598,227__________ <br /> <br />The foregoing Agreement Summary is for reference only and does not alter the terms of the Agreement, <br />including those set forth in Exhibit C. <br /> <br />Owner and Engineer hereby agree to modify the above-referenced Agreement as set forth in this <br />Amendment. All provisions of the Agreement not modified by this or previous Amendments remain in <br />effect. The Effective Date of this Amendment is __________________.
The URL can be used to link to this page
Your browser does not support the video tag.