Laserfiche WebLink
vAlik, y <br />� T <br />EXCAVATING <br />(574) Z62.4346 <br />City of South Bend <br />South Well Field - Chippewa Foam Board Insulation <br />1.12.24 <br />Labor <br />Type <br />Cost <br />Unit <br />Total <br />Foreman <br />$66.00 x <br />5.50 <br />HR = <br />$363.00 <br />Foreman OT <br />$87.00 x <br />HR = <br />$0.00 <br />Operator <br />$61.00 x <br />8.75 <br />HR = <br />$533.75 <br />Operator OT <br />$80.00 x <br />2.00 <br />HR = <br />$160.00 <br />Truck Driver <br />$43.00 x <br />2.00 <br />HR = <br />$86.00 <br />Truck Driver OT <br />$58.00 x <br />HR = <br />$0.00 <br />Laborer <br />$34.00 x <br />11.00 <br />HR = <br />$374.00 <br />Laborer OT <br />$46.00 x <br />1.00 <br />HR = <br />$46.00 <br />Labor Sub -Total: <br />$1,562.75 <br />Equipment <br />Type <br />Cost <br />Unit <br />Total <br />Deere 3506 - 2018 <br />$268.92 x <br />HR = <br />$0.00 <br />John Deere 135 Excavator <br />$160.45 x <br />HR = <br />$0.00 <br />John Deere 60G Excavator <br />$73.00 x <br />HR = <br />$0.00 <br />John Deere 544P Loader <br />$96.70 x <br />2.00 <br />HR = <br />$193.40 <br />John Deere 333G Skid Steer <br />$73.14 x <br />HR = <br />$0.00 <br />John Deere Off Road Truck <br />$187.55 x <br />HR = <br />$0.00 <br />Peterbilt <br />$118.43 x <br />HR = <br />$0.00 <br />Lowboy, 55 Ton <br />$39.11 x <br />HR = <br />$0.00 <br />Ford F-550 Super Duty <br />$45.00 x <br />HR = <br />$0.00 <br />Equipment Sub -Total: <br />$193.40 <br />Material & Subs <br />Type Cost Unit Total <br />2"x4"x8 Highload 60PSI Styrofoam $89.00 x 80.00 LS = $7,120.00 <br />x SY = $0.00 <br />x LS - $0.00 <br />x LS = $0.00 <br />x TN - $0.00 <br />x LS - $0.00 <br />x LS = $0.00 <br />Subcontractor Sub -Total: $7,120.00 <br />Direct Costs: $8,876.15 <br />Overhead: 10% $887.62 <br />Cost & Overhead: $9,763.77 <br />Markup: 5% $488.19 <br />C and E Excavating, Inc. T&M TOTAL: $10,251.95 <br />53767 County Road 9 <br />Elkhart, IN 46514 <br />