My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1 - South Well Field WWTP & Dist. System Imprvmts. - Contract B -Watermain Proj No. 117-059B - C&E
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Change Orders
>
Change Order No 1 - South Well Field WWTP & Dist. System Imprvmts. - Contract B -Watermain Proj No. 117-059B - C&E
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 9:40:35 AM
Creation date
4/9/2024 3:23:58 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/9/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DATE: <br />PROJECT NO: <br />PROJECT NAME: <br />CONTRACT DATE: <br />CHANGE ORDER NO. <br />CITY OF SOUTH BEND <br />DEPARTMENT OF PUBLIC WORKS <br />PROJECT CHANGE ORDER <br />04-01-2024 <br />117-059B DFO PROJ00000082 <br />South Well Field Water Treatment Plant and Distribution <br />System Improvements - Contract B - Water Main <br />09/12/2023 <br />1 <br />SUBJECT OF CHANGE ORDER: Additional Scope Items: Water Main Insulation Water Main <br />Repair. Additional Ductile Iron Fittings <br />All items completed substantially as planned. <br />See attached Comparison of Estimate for overruns and underruns. <br />The original contract sum $ 1,597,000.00 <br />Net change by previously authorized change orders $ 0.00 <br />The contract sum prior to this change order $ 1,597,000.00 <br />By this Change Order, the project amount is ® Increased <br />The new contract sum including this change order <br />This Change Order represents a total change of <br />Total change for entire project <br />Original contracted completion date/time <br />Extension of date/time by previous change orders <br />Date/time extension by this change order <br />New completion date/time <br />CONTRACTOR <br />❑ Decreased $ 23,606.65 <br />$ 1,620,606.65 <br />1.48 % <br />1.48 % <br />05/31 /2024 <br />0 Days <br />5 Days <br />06/05/2024 <br />RECOMMENDED FOR APPROVAL <br />N. XAz� 04-05-2024 <br />Construction Manager <br />CITY OF SOUTH BEND <br />BOARD OF PUBLIC WORKS <br />Contractor Signature <br />Thad Bessinoer, President <br />Printed Name and Title <br />C&E Excavating, Inc. <br />Company name <br />53767 County Road 9 <br />Address <br />Elkhart, Indiana 46514 <br />City, State, Zip <br />CITY OF SOUTH BEND, INDIANA <br />BOARD OF PUBLIC WORKS <br />Elizabeth A. Maradik, President <br />00�r 1� <br />Gary A. Gilot, Member <br />7r", ,C 7n'A�`+ <br />Murray L. Miller, Member <br />M/1 l <br />Joseph R. Molnar, Vice President <br />Briana�(Miicou, Member <br />' "/° <br />Attest: Theresa M. Heffner, Clerk <br />Date: April 9, 2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.