Laserfiche WebLink
QUOTE TABULATION <br />#122-007B Tree Removal <br />#124-009B Dubail Street Sidewalk <br />Engineer's <br />Estimate <br />John Ward <br />TX Concrete <br />Selge <br />Ortiz <br />Construction <br />Item No. <br />Line Item <br />Quantity <br />Unit <br />Cost <br />Cost <br />Cost <br />Cost <br />Cost <br />Concrete Sidewalk and Curb Ramp <br />1 <br />Construction <br />1 <br />LS <br />$19,396.91 <br />$28,860.00 <br />$15,500 <br />$47,600 <br />$13,676 <br />Non -Collusion Affadavit Yes Yes Yes Yes <br />I hereby certify that the above truly and <br />accurately represents bids received for <br />this project on 3/27/2024 <br />TII_�Mmb <br />Gemma Stanton, Project Engineer <br />