BID/PROPOSAL Addendum No. 1
<br />CITY OF SOUTH BEND
<br />31.
<br />Joint Adhesive, Surface Course
<br />3,205
<br />LFT
<br />$0.70
<br />$2,243.50
<br />32.
<br />PCCP, 8"
<br />750
<br />SYD
<br />$104.00
<br />$78,000.00
<br />33.
<br />PCCP, Colored, 8"
<br />220
<br />SYD
<br />$122.50
<br />$26,950.00
<br />34.
<br />PCCP for Approaches, 6"
<br />60
<br />SYD
<br />$84.00
<br />$5,040.00
<br />35.
<br />PCCP for Approaches, 8"
<br />300
<br />SYD
<br />$85.00
<br />$25,500.00
<br />36.
<br />Decorative Brick Pavers
<br />20
<br />SYD
<br />$743.68
<br />$14,873.60
<br />37.
<br />Brick Pavement
<br />70
<br />SYD
<br />$318.86
<br />$22,320.20
<br />38.
<br />Concrete Curb
<br />3,115
<br />LFT
<br />$28.50
<br />$88,777.50
<br />39.
<br />Concrete Curb and Gutter
<br />2,905
<br />LFT
<br />$27.50
<br />$79,887.50
<br />40.
<br />Concrete Sidewalk, 4"
<br />1,430
<br />SYD
<br />$66.00
<br />$94,380.00
<br />41.
<br />Concrete Sidewalk, 5"
<br />2,680
<br />SYD
<br />$62.00
<br />$166,160.00
<br />42.
<br />Concrete Sidewalk, Colored, 5"
<br />100
<br />SYD
<br />$132.00
<br />$13,200.00
<br />43.
<br />Concrete Curb Ramp
<br />400
<br />SYD
<br />$126.00
<br />$50,400.00
<br />44.
<br />Concrete Curb Ramp, Colored
<br />20
<br />SYD
<br />$225.00
<br />$4,500.00
<br />45.
<br />Detectable Warning Surface
<br />50
<br />SYD
<br />$98.50
<br />$4,925.00
<br />46.
<br />Sodding
<br />5,400
<br />SYD
<br />$7.37
<br />$39,798.00
<br />47.
<br />Street Tree
<br />101
<br />EA
<br />$695.00
<br />$70,195.00
<br />48.
<br />Shrub
<br />13
<br />EA
<br />$95.00
<br />$1,235.00
<br />49.
<br />Perennial
<br />118
<br />EA
<br />$40.00
<br />$4,720.00
<br />50.
<br />Tree Protection
<br />11
<br />EA
<br />$580.00
<br />$6,380.00
<br />51.
<br />Irrigation Allowance
<br />1
<br />LS
<br />$15,000.00
<br />$15,000.00
<br />52.
<br />Bench
<br />5
<br />EA
<br />$5,149.75
<br />$25,748.75
<br />53.
<br />Trash Receptacle
<br />1
<br />EA
<br />$6,131.13
<br />$6,131.13
<br />54.
<br />Bike Rack
<br />16
<br />EA
<br />$847.71
<br />$13,563.36
<br />55.
<br />Storm Sewer Manhole, 48"
<br />17
<br />EA
<br />$4,476.24
<br />$76,096.08
<br />56.
<br />Storm Sewer Manhole with Protective Coating, 48"
<br />2
<br />EA
<br />$5,239.66
<br />$10,479.32
<br />57.
<br />Storm Sewer Manhole, Doghouse, 48"
<br />1
<br />EA
<br />$8,094.38
<br />$8,094.38
<br />58.
<br />Storm Sewer Catch Basin
<br />5
<br />EA
<br />$2,910.71
<br />$14,553.55
<br />59.
<br />Storm Sewer Pipe, 12"
<br />1,365
<br />LFT
<br />$56.28
<br />$76,822.20
<br />60.
<br />Storm Sewer Pipe, 15"
<br />515
<br />LFT
<br />$55.61
<br />$28,639.15
<br />61.
<br />Storm Sewer Pipe, Water Main Grade, 15"
<br />105
<br />LFT
<br />$97.53
<br />$10,240.65
<br />62.
<br />Storm Sewer Pipe, 18"
<br />295
<br />LFT
<br />$65.88
<br />$19,434.60
<br />63.
<br />Connect to Structure
<br />5
<br />EA
<br />$3,846.99
<br />$19,234.95
<br />64.
<br />Water Main, 8"
<br />3,510
<br />LFT
<br />$80.91
<br />$283,994.10
<br />65.
<br />Water Service, 1"
<br />1,000
<br />LFT
<br />$96.84
<br />$96,840.00
<br />66.
<br />Gate Valve, 8"
<br />20
<br />EA
<br />$2,929.85
<br />$58,597.00
<br />67.
<br />Line Stop, 6"
<br />10
<br />EA
<br />$8,035.40
<br />$80,354.00
<br />Version 09/29/2021 Contractor's Bid for Public Works - 8