BID/PROPOSAL
<br />CITY OF SOUTH BEND
<br />Addendum No. 1
<br />Project Name:
<br />Downtown South Bend to Notre Dame Trail - Hill St. and South Bend Ave.
<br />rr
<br />Project Number:
<br />122-040B:
<br />For Bids Due:
<br />4/9/2024 a, 9:00 am
<br />WWI
<br />Contractor Name:
<br />Rieth-Riley Construction Co., Inc."
<br />Base Bid
<br />Item
<br />No.
<br />Description
<br />Quantity
<br />Unit
<br />Unit Price
<br />Total Amount
<br />1.
<br />Construction Engineering
<br />1
<br />LS
<br />$42,000.00
<br />$42,000.00
<br />2.
<br />Mobilization/Demobilization
<br />1
<br />LS
<br />$98,498.53
<br />$98,498.53
<br />3.
<br />Maintenance of Traffic
<br />1
<br />LS
<br />$33,186.46
<br />$33,186.46
<br />4.
<br />Erosion Control
<br />1
<br />LS
<br />$4,529.68
<br />$4,529.68
<br />5.
<br />Clearing Right of Way
<br />1
<br />LS
<br />$19,830.27
<br />$19,830.27
<br />6.
<br />Railroad Ties, Remove
<br />1,500
<br />LFT
<br />$16.66
<br />$24,990.00
<br />7.
<br />Common Excavation
<br />4,550
<br />CYD
<br />$42.23
<br />$192,146.50
<br />8.
<br />B Borrow
<br />1,650
<br />CYD
<br />$34.33
<br />$56,644.50
<br />9.
<br />Structure Backfill, Undistributed
<br />500
<br />CYD
<br />$48.50
<br />$24,250.00
<br />10.
<br />Tree, 6", Remove
<br />1
<br />EA
<br />$400.00
<br />$400.00
<br />11.
<br />Tree, 10°,Remove
<br />4
<br />EA
<br />$600.00
<br />$2,400.00
<br />12.
<br />Tree, 18",Remove
<br />6
<br />EA
<br />$800.00
<br />$4,800.00
<br />13.
<br />Tree, 30", Remove
<br />1
<br />EA
<br />$2,000.00
<br />$2,000.00
<br />14.
<br />Sign, Remove
<br />21
<br />EA
<br />$50.00
<br />$1,050.00
<br />15.
<br />Sign, Relocate
<br />4
<br />EA
<br />$75.00
<br />$300.00
<br />16.
<br />Light Pole, Remove
<br />15
<br />EA
<br />$300.00
<br />$4,500.00
<br />17.
<br />Pipe, Remove
<br />4,585
<br />LFT
<br />$26.13
<br />$119,806.05
<br />18.
<br />Structures, Remove
<br />28
<br />EA
<br />$421.84
<br />$11,811.52
<br />19.
<br />Fire Hydrant, Remove
<br />5
<br />EA
<br />$738.21
<br />$3,691.05
<br />20.
<br />Concrete Curb, Remove
<br />5,565
<br />LFT
<br />$8.02
<br />$44,631.30
<br />21.
<br />Concrete Approaches and Sidewalk, Remove
<br />3,315
<br />SYD
<br />$9.74
<br />$32,288.10
<br />22.
<br />Concrete Pavement, Remove
<br />6,820
<br />SYD
<br />$16.01
<br />$109,188.20
<br />23.
<br />Brick, Remove and Salvage
<br />1,345
<br />SYD
<br />$9.26
<br />$12,454.70
<br />24.
<br />Compacted Aggregate, No. 53
<br />5,110
<br />TON
<br />$38.21
<br />$195,253.10
<br />25.
<br />Item Omitted
<br />26.
<br />HMA for Patching
<br />10
<br />TON
<br />$412.50
<br />$4,125.00
<br />27.
<br />HMA Surface, 9.5 mm - Type B, PG 70-22P
<br />810
<br />TON
<br />$112.00
<br />$90,720.00
<br />28.
<br />HMA Intermediate, 12.5 mm - Type B, PG 64-22
<br />1,340
<br />TON
<br />$90.00
<br />$120,600.00
<br />29.
<br />HMA Base, 25 mm - Type B, PG 64-22
<br />3,200
<br />TON
<br />$75.00
<br />$240,000.00
<br />30.
<br />Tack Coat
<br />2.7
<br />TON
<br />$548.00
<br />$1,479.60
<br />Version 09/29/2021 Contractor's Bid for Public Works - 7
<br />
|