My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Wastewater SCADA Control Systems for Lift Station – Black & Veatch Corp.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Wastewater SCADA Control Systems for Lift Station – Black & Veatch Corp.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2024 3:58:22 PM
Creation date
3/26/2024 3:58:04 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
3/26/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> Page 10 <br />(Exhibit A – Engineer’s Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />3, Engineer shall be entitled to an equitable increase in compensation if Construction Phase <br />services (including Resident Project Representative services, if any) are required after the original <br />date for completion and readiness for final payment of Contractor as set forth in the Construction <br />Contract. <br />C. Limitation of Responsibilities: Engineer shall not be responsible for the acts or omissions of any <br />Contractor, Subcontractor or Supplier, or other individuals or entities performing or furnishing any <br />of the Work, for safety or security at the Site, or for safety precautions and programs incident to <br />Contractor's Work, during the Construction Phase or otherwise. Engineer shall not be responsible <br />for the failure of any Contractor to perform or furnish the Work in accordance with the Contract <br />Documents. <br />N1.06 Post-Construction Phase <br />A. Upon written authorization from Ownerduring the Post-Construction Phase Engineer shall: <br />1. Together with Owner, visit the Project to observe any apparent defects in the Work, assist <br />Owner in consultations and discussions with Contractor concerning correction of any such <br />defects, and make recommendations as to replacement or correction of defective Work, if <br />any. <br />2. Together with Owner or Owner’s representative, visit the Project within one month before <br />the end of the correction period to ascertain whether any portion of the Work is subject to <br />correction. <br />3. Perform or provide the following additional Post-Construction Phase tasks or deliverables: <br />[Here list any such tasks or deliverables] <br />B. The Post-Construction Phase services may commence during the Construction Phase and, if not <br />otherwise modified in this Exhibit A, will terminate twelve months after the commencement of the <br />Construction Contract’s correction period. <br />PART 2 – ADDITIONAL SERVICES <br />A2.01 Additional Services Requiring Owner’s Written Authorization <br /> <br />A. If authorized in writing by Owner, Engineer shall furnish or obtain from others Additional Services <br />of the types listed below. <br />1. Preparation of applications and supporting documents (in addition to those furnished under <br />Basic Services) for private or governmental grants, loans, or advances in connection with <br />the Project; preparation or review of environmental assessments and impact statements; <br />review and evaluation of the effects on the design requirements for the Project of any such <br />statements and documents prepared by others; and assistance in obtaining approvals of <br />authorities having jurisdiction over the anticipated environmental impact of the Project. <br />2. Services to make measured drawings of or to investigate existing conditions or facilities, or <br />to verify the accuracy of drawings or other information furnished by Owner or others.
The URL can be used to link to this page
Your browser does not support the video tag.