My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Wastewater SCADA Control Systems for Lift Station – Black & Veatch Corp.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Wastewater SCADA Control Systems for Lift Station – Black & Veatch Corp.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2024 3:58:22 PM
Creation date
3/26/2024 3:58:04 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
3/26/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> Page 9 <br />(Exhibit A – Engineer’s Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />Contractor’s Work as it is performed and furnished have been exhaustive, extended to <br />every aspect of Contractor’s Work in progress, or involved detailed inspections of the <br />Work beyond the responsibilities specifically assigned to Engineer in this Agreement <br />and the Contract Documents. Neither Engineer’s review of Contractor’s Work for the <br />purposes of recommending payments nor Engineer’s recommendation of any payment <br />including final payment will impose on Engineer responsibility to supervise, direct, or <br />control Contractor’s Work in progress or for the means, methods, techniques, <br />sequences, or procedures of construction or safety precautions or programs incident <br />thereto, or Contractor’s compliance with Laws and Regulations applicable to <br />Contractor’s furnishing and performing the Work. It will also not impose responsibility <br />on Engineer to make any examination to ascertain how or for what purposes Contractor <br />has used the moneys paid on account of the Contract Price, or to determine that title to <br />any portion of the Work in progress, materials, or equipment has passed to Owner free <br />and clear of any liens, claims, security interests, or encumbrances, or that there may not <br />be other matters at issue between Owner and Contractor that might affect the amount <br />that should be paid. <br />16. Contractor’s Completion Documents: Receive, review, and transmit to Owner <br />maintenance and operating instructions, schedules, guarantees, bonds, certificates or other <br />evidence of insurance required by the Contract Documents, certificates of inspection, tests <br />and approvals, Shop Drawings, Samples and other data approved as provided under <br />Paragraph A1.05.A.11, and transmit the annotated record documents which are to be <br />assembled by Contractor in accordance with the Contract Documents to obtain final <br />payment. The extent of such review by Engineer will be limited as provided in Paragraph <br />A1.05.A.11. <br />17. Substantial Completion: Promptly after notice from Contractor that Contractor considers <br />the entire Work ready for its intended use, in company with Owner and Contractor, visit the <br />Project to determine if the Work is substantially complete. If after considering any <br />objections of Owner, Engineer considers the Work substantially complete, Engineer shall <br />deliver a certificate of Substantial Completion to Owner and Contractor. <br />18. Additional Tasks: Perform or provide the following additional Construction Phase tasks or <br />deliverables: [here list any such tasks or deliverables]. <br />19. Final Notice of Acceptability of the Work: Conduct a final visit to the Project to determine <br />if the completed Work of Contractor is acceptable so that Engineer may recommend, in <br />writing, final payment to Contractor. Accompanying the recommendation for final <br />payment, Engineer shall also provide a notice in the form attached hereto as Exhibit E (the <br />“Notice of Acceptability of Work”) that the Work is acceptable (subject to the provisions of <br />Paragraph A1.05.A.15.b) to the best of Engineer’s knowledge, information, and belief and <br />based on the extent of the services provided by Engineer under this Agreement. <br />B. Duration of Construction Phase: The Construction Phase will commence with the execution of <br />the first Construction Contract for the Project or any part thereof and will terminate upon written <br />recommendation by Engineer for final payment to Contractors. If the Project involves more than <br />one prime contract as indicated in Paragraph A1.03.C, then Construction Phase services may be <br />rendered at different times in respect to the separate contracts. Subject to the provisions of Article
The URL can be used to link to this page
Your browser does not support the video tag.