n ceounoecea DBE/WBE/FBE Certified <br />• Chain link fence to be set up around the perimeter. <br />• Signs to be posted on fence "Danger do not enter" by Alpine Demolition. <br />• Alpine Demolition will spray water on demolition debris to keep dust down. <br />• Spotters will be utilized during demolition preventing pedestrians from enteringthe demolition zone. <br />• Site to be left clean at end of shift with no loose debris. <br />8. Engineer Controls <br />o Alpine demolition will hook up to a hydrant to utilize water for dust control. <br />o Garbage trucks will cover the trailer prior to transport out of the work area to prevent spillage. <br />9. Equipment: <br />• Volvo EC480E Hi Reach Excavator w/ Hydraulic Grapple <br />• Volvo EC750E Hi Reach Excavator <br />• CAT 262 skid steer with grapple and sweeper attachment <br />10. Building Demolition <br />o After inspection and discussion, find a safe starting point on one of the buildings. Use the grapple to grab <br />the roof and roof joists and bring them to the ground. <br />o Separate the metal debris and garbage debris into different piles. <br />o Load out debris in semi trailers. <br />o All debris will be sprayed with a fire hose throughout the process to reduce dust. <br />o Trucks to be loaded within work area for removal of material off site per contract specifications. <br />o Trucks will be lined with plastic and covered prior to transport offsite. <br />o Use bucket attachment to peel up the slab and foundations. <br />o Dig out and process the concrete in the basement voids. <br />o Break concrete into manageable pieces for transport. <br />o Repeat the steps above for the transport requirements. <br />o Affected streets to be swept clean. <br />o An asbestos supervisor will be onsite throughout the demolition process. <br />o Brrom sweep the slabs prior to demobilization, <br />o Backfill foundation voids with clean clay dirt. <br />o Lay topsoli and seed affected areas. <br />The above plan maybe modified and change as job conditions warrant. Please call me should there be any questions regarding <br />the above. <br />Sincerely, <br />Zach Krueger <br />Project Engineer <br />