Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />40. <br />Concrete Curb Ramp <br />600 <br />SYD <br />$148.56 <br />$89,136.00 <br />41. <br />Concrete Curb Ramp, Colored <br />50 <br />SYD <br />$267.58 <br />$13,379.00 <br />42. <br />Detectable Warning Surface <br />70 <br />SYD <br />$145.53 <br />$10,187.10 <br />43. <br />1 Sodding <br />8,000 <br />SYD <br />$4.98 <br />$39,840.00 <br />44. <br />Street Tree <br />123 <br />EA <br />$695.00 <br />$85,485.00 <br />45. <br />Shrub <br />42 <br />EA <br />$75.00 <br />$3,150.00 <br />46. <br />Ornamental Grass <br />205 <br />EA <br />$31.00 <br />$6,355.00 <br />47. <br />Perennial <br />1,920 <br />EA <br />$24.00 <br />$46,080.00 <br />48. <br />Bench <br />5 <br />EA <br />$5,996.53 <br />$29,982.65 <br />49. <br />Seat Wall <br />3 <br />EA <br />$2,800.00 <br />$8,400.00 <br />50. <br />Trash Receptacle <br />3 <br />EA <br />$1 ,212.02 <br />$3,636.06 <br />51. <br />Bike Rack <br />8 <br />EA <br />$919.02 <br />$7,352.16 <br />52. <br />Storm Sewer Manhole, 48" <br />19 <br />EA <br />$4,921.93 <br />$93,516.67 <br />53. <br />Storm Sewer Manhole with Protective Coating, 48" <br />6 <br />EA <br />$5,934.85 <br />$35,609.10 <br />54. <br />Storm Sewer Catch Basin <br />15 <br />EA <br />$3,362.53 <br />$50,437.95 <br />55. <br />Storm Sewer Pipe, 12" <br />1,626 <br />LFT <br />$58.08 <br />$94,438.08 <br />56. <br />Storm Sewer Pipe, Water Main Grade, 12" <br />429 <br />LFT <br />$80.19 <br />$34,401.51 <br />57. <br />Storm Sewer Pipe, 15" <br />380 <br />LFT <br />$63.80 <br />$24,244.00 <br />58. <br />Storm Sewer Pipe, Water Main Grade, 15" <br />87 <br />LFT <br />$103.89 <br />$9,038.43 <br />59. <br />Storm Sewer Pipe, 18" <br />435 <br />LFT <br />$70.39 <br />$30,619.65 <br />60. <br />Connect to Structure <br />2 <br />EA <br />$3,531.42 <br />$7,062.84 <br />61. <br />Water Main, 8" <br />2,450 <br />LFT <br />$77.97 <br />$191,026.50 <br />62. <br />Water Main, 10" <br />430 <br />LFT <br />$156.12 <br />$67,131.60 <br />63. <br />Water service, 1" <br />2,010 <br />LFT <br />$76.34 <br />$153,443.40 <br />64. <br />Gate Valve, 8" <br />13 <br />EA <br />$3,254.39 <br />$42,307.07 <br />65. 1 <br />Gate Valve, 10" <br />1 <br />EA <br />$4, 305.56 <br />$4, 305.56 <br />66. <br />Insertion Valve, 10" <br />2 <br />EA <br />$5,235.74 <br />$10,471.48 <br />67. <br />Line Stop, 4" <br />1 <br />EA <br />$8,319.48 <br />$8,319.48 <br />68. <br />Line Stop, 6" <br />5 <br />EA <br />$8,691.81 <br />$43,459.05 <br />69. <br />Sleeve, 8" <br />1 <br />EA <br />$937.26 <br />$937.26 <br />70. <br />Tapping Sleeve, 6" <br />1 <br />EA <br />$6,386.57 <br />$6,386.57 <br />71. <br />Tapping Sleeve, 20" <br />2 <br />EA <br />$10,269.89 <br />$20,539.78 <br />72. <br />Bend, 22.5 Degree, 8" <br />4 <br />EA <br />$1, 383.60 <br />$5, 534.40 <br />73. <br />Bend, 45 Degree, 8" <br />8 <br />EA <br />$941.11 <br />$7,528.88 <br />74. <br />Bend, 45 Degree, 10" <br />6 <br />EA <br />$1 ,136.05 <br />$6,816.30 <br />75. <br />Cross, 8" <br />2 <br />EA <br />$3,022.08 <br />$6,044.16 <br />76. <br />Tee, 8" <br />2 <br />EA <br />$2,712.17 <br />$5,424.34 <br />77. <br />Reducer, 8"x6" <br />6 <br />EA <br />$2, 348.68 <br />$14, 092.08 <br />78. <br />Cap, 4" <br />1 <br />EA <br />$2,089.06 <br />$2,089.06 <br />79. <br />Cap, 6" <br />2 <br />EA <br />$2,149.61 <br />$4,299.22 <br />80. <br />Fire Hydrant, Assembly <br />4 <br />EA <br />$8,636.13 <br />$34,544.52 <br />81. <br />Adjust Valve to Grade <br />1 <br />EA <br />$984.60 <br />$984.60 <br />82. <br />Adjust Casting to Grade <br />15 <br />EA <br />$984.60 <br />$14,769.00 <br />83. <br />Replace and Adjust Casting to Grade <br />1 <br />EA <br />$1 ,758,10 <br />$1 ,758.10 <br />84. <br />Structure, Manhole, Reconstruct <br />15 <br />LFT <br />$1 ,141.02 <br />$17,115.30 <br />85. <br />Item Omitted <br />Version 09/29/2021 Contractor's Bid for Public Works - 8 <br />