Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name: Downtown South Bend to Notre Dame Trail - Notre Dame Avenue ,. <br />Project Number: 122-040A <br />For Bids Due: 3/12/24 @ 9:00 AM <br />Contractor Name: Rieth-Riley Construction Co., Inc. <br />Base Bid <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1. <br />Construction Engineering <br />1 <br />LS <br />$39,800.00 <br />$39,800.00 <br />2. <br />Mobilization/Demobilization <br />1 <br />LS <br />$210,000.00 <br />$210,000.00 <br />3. <br />Maintenance of Traffic <br />1 <br />LS <br />$73,150.50 <br />$73,150.50 <br />4. <br />Erosion Control <br />1 <br />LS <br />$3,090.11 <br />$3,090.11 <br />5. <br />Clearing Right of Way <br />1 <br />LS <br />$25,041.05 <br />$25,041.05 <br />6. <br />Common Excavation <br />4,000 <br />CYD <br />$51.58 <br />$206,320.00 <br />7. <br />B Borrow <br />1,680 <br />CYD <br />$36.74 <br />$611723.20 <br />8. <br />Tree,12",Remove <br />12 <br />EA <br />$400.00 <br />$4,800.00 <br />9. <br />Tree,18",Remove <br />7 <br />EA <br />$700.00 <br />$4,900.00 <br />10. <br />Tree, 30", Remove <br />5 <br />EA <br />$1, 500.00 <br />$7, 500.00 <br />11. <br />Sign, Remove <br />33 <br />EA <br />$50.00 <br />$1 ,650.00 <br />12. <br />Sign, Relocate <br />18 <br />EA <br />$75.00 <br />$1 ,350.00 <br />13. <br />Light Pole, Remove <br />15 <br />EA <br />$300.00 <br />$4,500.00 <br />14. <br />Pipe, Remove <br />4,310 <br />LFT <br />$19.40 <br />$83, 614.00 <br />15. <br />Structures, Remove <br />33 <br />EA <br />$672.70 <br />$22,199.10 <br />16. <br />Fire Hydrant, Remove <br />4 <br />EA <br />$736.78 <br />$2,947.12 <br />17. <br />Concrete Curb, Remove <br />5,300 <br />LFT <br />$9.02 <br />$47,806.00 <br />18. <br />Concrete Approaches and Sidewalk, Remove <br />2,340 <br />SYD <br />$19.70 <br />$46,098.00 <br />19. <br />Concrete Pavement, Remove <br />5,310 <br />SYD <br />$25.98 <br />$137, 953.80 <br />20. <br />Brick, Remove and Salvage <br />4,425 <br />SYD <br />$7.80 <br />$34, 515.00 <br />21. <br />Asphalt Milling, Variable Depth <br />610 <br />SYD <br />$27.36 <br />$16,689.60 <br />22. <br />Compacted Aggregate, No. 53 <br />5,425 <br />TON <br />$47.13 <br />$255,680.25 <br />23. <br />HMA Surface, 9.5 mm - Type B, PG 70-28P <br />825 <br />TON <br />$120.24 <br />$99,198.00 <br />24. <br />HMA Intermediate, 12.5 mm - Type B, PG 64-22 <br />1,285 <br />TON <br />$88.07 <br />$113,169.95 <br />25. <br />HMA Base, 25 mm - Type B, PG 64-22 <br />3,075 <br />TON <br />$78.01 <br />$239,880.75 <br />26. <br />Joint Adhesive, Surface Course <br />6,260 <br />LFT <br />$0.70 <br />$4,382.00 <br />27. <br />Item Omitted <br />28. <br />PCCP, 8" <br />965 <br />SYD <br />$108.45 <br />$104, 654.25 <br />29. <br />Item Omitted <br />30. <br />PCCP, Colored, 8" <br />190 <br />SYD <br />$133.70 <br />$25,403.00 <br />31. <br />PCCP for Approaches, 6" <br />575 <br />SYD <br />$70.00 <br />$40,250.00 <br />32. <br />PCCP for Approaches, 8" <br />415 <br />SYD <br />$87.66 <br />$36, 378.90 <br />33. <br />D-1 Contraction Joint <br />425 <br />LFT <br />$21.95 <br />$9,328.75 <br />34. <br />Decorative Brick Pavers <br />140 <br />SYD <br />$376.50 <br />$52,710.00 <br />35. <br />Concrete Curb <br />970 <br />LFT <br />$35.96 <br />$34,881.20 <br />36. <br />Concrete Curb and Gutter <br />4,575 <br />LFT <br />$23.53 <br />$107,649.75 <br />37. <br />Concrete Sidewalk, 4" <br />1,295 <br />SYD <br />$71.36 <br />$92,411.20 <br />38. <br />Concrete Sidewalk, 5" <br />2,510 <br />SYD <br />$69.14 <br />$173, 541.40 <br />39. <br />Concrete Sidewalk, Colored, 5" <br />120 <br />SYD <br />$152.01 <br />$18,241.20 <br />Version 09/29/2021 Contractor's Bid for Public Works - 7 <br />