Laserfiche WebLink
Page 5 (Exhibit K – (Amendment to Owner-Engineer Agreement) – Attachment 1) B. Engineer’s services under the 90% Design Phase will be considered complete on the date when the 90% Design Plans, Preliminary Specifications, and Opinion of Probable Construction Cost have been delivered to Owner. A1.11 Final Design Phase A. After acceptance by Owner of the 90% Design Plans, Preliminary Specifications, and Opinion of Probable Construction Cost as determined in the 90% Design Phase, and any other deliverables subject to any Owner-directed modifications or changes in the scope, extent, character, or design requirements of or for the Project, and upon written authorization from Owner, Engineer shall: 1. Prepare Final Drawings and Specifications indicating the scope, extent, and character of the Work to be performed and furnished by Contractor. 2. Provide technical criteria, written descriptions, and design data for Owner’s use in filing applications for permits from or approvals of governmental authorities having jurisdiction to review or approve the final design of the Project; assist Owner in consultations with such authorities; and revise the Drawings and Specifications in response to directives from such authorities. 3. Advise Owner of any adjustments to the Opinion of Probable Construction Cost known to Engineer. 4. Prepare and furnish bidding documents for review by Owner, its legal counsel, and other advisors, and assist Owner in the preparation of other related documents. Owner shall submit to Engineer any comments and, subject to the provisions of Paragraph 6.01.G, instructions for revisions. 5. Revise the bidding documents in accordance with comments and instructions from the Owner, as appropriate, and submit (1) electronic final copies of the bidding documents, a revised Opinion of Probable Construction Cost, and any other deliverables to Owner after receipt of Owner’s comments and instructions. B. Engineer’s services under the Final Design Phase will be considered complete on the date when the Final Plans, Final Specifications, and Final Opinion of Probable Construction Cost have been delivered to Owner. C. The number of prime contracts for Work designed or specified by Engineer upon which the Engineer’s compensation has been established under this Agreement is (1). If more prime contracts are awarded, Engineer shall be entitled to an equitable increase in its compensation under this Agreement. A1.12 Permitting A. DLZ shall prepare and submit the documentation to apply for permit coverage under the Construction Stormwater General Permit (CSGP). The scope shall include the following: