My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 1 to OEA - Byer's Softball Proj No. 123-072 – DLZ Indiana, LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No 1 to OEA - Byer's Softball Proj No. 123-072 – DLZ Indiana, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2024 1:33:59 PM
Creation date
2/27/2024 1:33:49 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
2/27/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 4 (Exhibit K – (Amendment to Owner-Engineer Agreement) – Attachment 1) e. Grading and Drainage Plans f. Utility Plans g. Aquatics Plans h. Landscape Plans i. Electrical Plans j. Architectural Plans (Existing building renovation only) and limited electrical and mechanical plans. k. Details 3. Deliverable - Furnish (1) electronic review copy of the 60% Design Phase documents to Owner. a. Submittal will include the following deliverables. 1) 60% Design Plans 2) Specification list and relevant product selection data 3) Opinion of Probable Costs B. Engineer’s services under the 60% Design Phase will be considered complete on the date when the 60% Design Plans, Specifications/Product Data, and Opinion of Probable Construction Cost have been delivered to Owner. A1.10 90% Design Phase A. After acceptance by Owner of the 60% Design Plans, Preliminary Specifications, and Opinion of Probable Construction Cost as determined in the 60% Design Phase, and any other deliverables subject to any Owner-directed modifications or changes in the scope, extent, character, or design requirements of or for the Project, and upon written authorization from Owner, Engineer shall: 1. Further develop the Plan Drawings listed in the 60% Design Phase to a 90% level of completion. 2. Advise Owner if additional reports, data, information, or services of the types described in Exhibit B are necessary and assist Owner in obtaining such reports, data, information, or services. 3. Deliverable - Furnish (1) electronic review copy of the 90% Design Phase documents to Owner. a. Submittal will include the following deliverables. 1) 90% Design Plans 2) Preliminary Specifications 3) Opinion of Probable Costs
The URL can be used to link to this page
Your browser does not support the video tag.