Mr. Zach Hurst
<br />January 15, 2024, revised January 31, 2024
<br />Page 5
<br />2023.03157
<br />American Structurepoint. Assumed approval of contractor’s schedule/logistics plan at contract award.
<br />2. Review of the final construction, determining whether the project is substantially complete, and filing
<br />the appropriate forms with the local building authorities to allow for occupancy of the premises.
<br />3. Preparation of a final punch list of unfinished or defective work and distribution to the Owner
<br />4. Presentations for public hearings (American Structurepoint will provide support only, as we have
<br />assumed an attorney will handle any filings and presentations to the zoning board, city council, and/or
<br />plan commission.)
<br />5. Furniture, furnishings, and equipment selection
<br />6. Filing for, acquisition of, and fees for obtaining a building permit, improvement location permit, or
<br />other governmental approvals, unless noted above
<br />7. Traffic impact studies, traffic signal warrant analysis, traffic signal design
<br />8. Design of hangers, supports, and bracing for mechanical, electrical, plumbing, and other non‐
<br />structural components
<br />9. Analysis of floor slabs or framing systems for temporary or construction loads such as lift trucks,
<br />vehicle loads, etc.
<br />10. Design of floor slabs or framing systems for vibration resistance more stringent than for typical office
<br />occupancy
<br />11. Design of pile‐supported or other non‐conventional foundation systems
<br />12. Design for support of specialized medical equipment or high‐density file storage
<br />13. Preparation of shop or fabrication drawings
<br />14. Design and detailing of off‐site infrastructure improvements, including master planning, off‐site
<br />stormwater facilities, water mains, sanitary sewers, storm sewer, electric, gas, and road
<br />improvements.
<br />15. Easement or right‐of‐way descriptions, construction staking and layout, any additional topographic,
<br />route, or utility survey, boundary survey, ALTA survey, as‐built surveys except as mentioned above,
<br />post‐construction or record drawings, primary platting, setting concrete monuments, and private
<br />utility locate, construction staking or layout, right‐of‐way acquisitions.
<br />16. Irrigation plans, site lighting (photometric) plans, hardscape plans, tree preservation plan, retaining
<br />wall design, preliminary development plans, and water well design.
<br />17. Geotechnical materials testing or environmental reports/studies other than those specified above
<br />18. Preparation of opinion of probable construction cost other than mentioned above.
<br />19. Off‐site infrastructure improvement plans or details (road, sewer, utility, or drainage), on‐site or off‐
<br />site drainage analysis or improvements, or modifications of the master drainage plan, if required by
<br />regulatory agencies or the owner
<br />20. Phased construction plans, bidding assistance, or bidding services.
<br />21. Off‐site utility main extension, storm sewer or sanitary sewer lift station design, or storm sewer
<br />profile.
<br />22. Determination of location or depth of utilities by means such as vacuum excavation or potholing.