| 
								    ENGINEERING 
<br />ENVIRONMENTAL 
<br />INSPECTION 
<br />LAND SURVEYING 
<br />LAND ACQUISITION 
<br />PLANNING 
<br />WATER & 
<br />WASTEWATER 
<br />SINCE 1965 
<br />OFFICERS 
<br />Steven W. Jones 
<br />Christopher R. Pope, PE 
<br />B. Keith Bryant, PE 
<br />Michael A. Rowe, PE 
<br />Jon E. Clodfelter, PE  
<br />Paul D. Glotzbach, PE 
<br />PROFESSIONAL STAFF 
<br />Andrew T. Wolka, PE 
<br />Devin L. Stettler, AICP 
<br />Michael S. Oliphant, AICP 
<br />Timothy J. Coomes, PLS 
<br />Steven R. Passey, PE 
<br />Brian J. Pierson, PE 
<br />Christopher L. Hammond, PE 
<br />Brian S. Frederick, PE 
<br />Jay N. Ridens, PE 
<br />Christopher J. Dyer, PE 
<br />Jeromy A. Richardson, PE 
<br />Heather E. Kilgour, PE 
<br />Adam J. Greulich, PLS 
<br />Caleb C. Ross, PE 
<br />Dann C. Barrett, PE 
<br />Scott G. Minnich, PE 
<br />Michael D. Farrell, CPA 
<br />Kelton S. Cunningham, PE 
<br />Braun S. Rodgers, PE 
<br />Chris J. Andrzejewski, PE 
<br />Eric S. Harned, PE 
<br />Andrew J. Allison, PE 
<br />Abigail I. Godsey, PE 
<br />Gretchen A. Meyer, PE 
<br />Brian S. Haefliger, PE 
<br />Ricardo J. Paredes Aronsohn, PE 
<br />Corbin A. Schwiebert, PE 
<br />Tim B. Leemhuis, PE 
<br />Hogan W. Sills, PE 
<br />Jeffrey E. Lazzell, PE 
<br />Kyle D. Kent, PE 
<br />Bradley Salpietro, PE 
<br />Steven Zehr, PE 
<br />John D. SanGiorgio, PE 
<br />Troy A. Casey, PE 
<br />Mitchell D. Lankford, PE 
<br />Joy L. Bosse, PE 
<br />Melissa A. Stone, PE 
<br />Tony Fadoul, PE          8440 Allison Pointe Blvd., Suite 200, Indianapolis, IN  46250     (317) 895-2585     www.ucindy.com PhddJanuary 30, 2024 
<br />Gemma Stanton 
<br />ERC/Project Engineer 
<br />City of South Bend 
<br />227 W. Jefferson Blvd. 
<br />South Bend, IN 46601 
<br />RE: DES 2100025 
<br />Safe Routes to School at Our Lady of Hungary 
<br />Draft Agreement Submittal 
<br />Dear Ms. Stanton: 
<br />Thank you for entrusting the Construction Inspection Services for the City of South Bend 
<br />Safe Routes to School at Our Lady of Hungary project to United Consulting. We are 
<br />transmitting herewith one copy of the revised draft LPA-Consultant Contract along with the 
<br />following information for the referenced project: 
<br />1. Process to submit Contracts to INDOT
<br />2. Project Scope Summary
<br />3. Time Justification Summary
<br />4. INDOT overhead letter United
<br />5. INDOT Pre-Qualification letter United
<br />6. LPA-Consultant Contract Review Checklist
<br />7. Hourly Justification worksheet
<br />8. Rate Calculation sheet United
<br />9. Weighted Rates by Classification
<br />10. LPA-Consultant Contract (1 copy)
<br />A portion of this work is anticipated to be reimbursed by INDOT. We will provide all 
<br />the documentation required by INDOT for reimbursement along with our regular invoices. 
<br />We are happy to attend the Board of Public Works meeting, if needed, when you present 
<br />this contract for approval. 
<br />If you have any comments, please contact me anytime. My cell phone number is 
<br />(317)502.4246.
<br />Sincerely, 
<br />UNITED CONSULTING 
<br />Brian N. Miller, Manager 
<br />Construction Inspection Services 
<br />c: Terry Minix - Business Development United Consulting 
<br />File (pending)
<br />Updated 2/6/24
								 |