Laserfiche WebLink
8802 North Meridian St. • Indianapolis, IN 46260 • 317.842.2616 phone • 317.841.4257 fax • www.BowenEngineering.com PAGE 2 OF 2 Pricing Option #2 — Replace in kind stainless steel. Lump Sum Cost: $ 199,346.00 Scope of Work: - Remove existing stainless steel fabricated pipe from 24” flange to 18” flanges on common finish water header on the second floor of the North Station. - Cut existing 18” vertical riser as needed and install new 18” stub end. - Reuse existing hangers. - New piping to be 316L stainless steel, Heliarc welded, and argon purged. Clarifications: - No pressure testing has been included other than an in-service test. - No weld inspection / NDE Testing has been included. - One mobilization has been included. Additional mobilization if required will incur additional costs. - No overtime / premium time has been included. - Pipeline can be isolated for the duration required to complete the scope of work. - Plant personnel will be responsible for isolation of areas as required to complete the scope of work. - Zimmerman is a trusted contractor of the City of South Bend. Therefore, to reduce the cost of the proposal, BEC has eliminated supervision cost to oversee Zimmerman and will not be onsite. - Additional contract time will be required. A revised completion date will be mutually agreed to. Thank you for the opportunity, Mitchell Stull, Senior Project Engineer Mobile: 317-650-8313 | Email: mstull@bowenengineering.com