My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 4 - North Water Treatment Plant Improvements Proj No. 119-011 - Bowen
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Change Orders
>
Change Order No 4 - North Water Treatment Plant Improvements Proj No. 119-011 - Bowen
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 3:11:11 PM
Creation date
2/13/2024 3:11:07 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
2/13/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8802 North Meridian St. • Indianapolis, IN 46260 • 317.842.2616 phone • 317.841.4257 fax • www.BowenEngineering.com PAGE 2 OF 2 Pricing Option #2 — Replace in kind stainless steel. Lump Sum Cost: $ 199,346.00 Scope of Work: - Remove existing stainless steel fabricated pipe from 24” flange to 18” flanges on common finish water header on the second floor of the North Station. - Cut existing 18” vertical riser as needed and install new 18” stub end. - Reuse existing hangers. - New piping to be 316L stainless steel, Heliarc welded, and argon purged. Clarifications: - No pressure testing has been included other than an in-service test. - No weld inspection / NDE Testing has been included. - One mobilization has been included. Additional mobilization if required will incur additional costs. - No overtime / premium time has been included. - Pipeline can be isolated for the duration required to complete the scope of work. - Plant personnel will be responsible for isolation of areas as required to complete the scope of work. - Zimmerman is a trusted contractor of the City of South Bend. Therefore, to reduce the cost of the proposal, BEC has eliminated supervision cost to oversee Zimmerman and will not be onsite. - Additional contract time will be required. A revised completion date will be mutually agreed to. Thank you for the opportunity, Mitchell Stull, Senior Project Engineer Mobile: 317-650-8313 | Email: mstull@bowenengineering.com
The URL can be used to link to this page
Your browser does not support the video tag.