My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 4 - North Water Treatment Plant Improvements Proj No. 119-011 - Bowen
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Change Orders
>
Change Order No 4 - North Water Treatment Plant Improvements Proj No. 119-011 - Bowen
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 3:11:11 PM
Creation date
2/13/2024 3:11:07 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
2/13/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8802 North Meridian St. • Indianapolis, IN 46260 317.842.2616 phone • 317.841.4257 fax • BowenEngineering.com PAGE 1 OF 2 December 21, 2023 City of South Bend Attn: Rebecca Plantz 227 West Jefferson Boulevard South Bend, IN 46601-1830 RE: South Bend North Treatment Plant Improvements Bowen Project Number: 15 – 22 – 042 PCO-08 Vessel #3 thru #5 FW Header Replacement, Phase II Rebecca: Bowen Engineering (BEC) is pleased to submit this proposal for the Owner’s review and approval for the additional scope of work of replacing a portion of the 30” stainless steel fabricated pipe on the common finish water header at the North Station. Attached is a one-line sketch of the proposed piping replacement associated with this proposal. Pricing Option #1 — Schedule 80 PVC Pipe and JCM 303 Fabricated Flanged Coupling Adapter Lump Sum Cost: $ 107,501.00 Scope of Work: - Remove existing stainless steel fabricated pipe from 24” flange to 18” flanges on common finish water header on the second floor of the North Station. - Cut existing 18” vertical riser as needed to install new schedule 80 PVC piping. Use JCM Model #303 Fabricated Flange Coupling Adapter or equal to connect schedule 80 PVC piping to existing schedule 10 stainless steel piping. - Reuse existing hangers Clarifications: - No pressure testing has been included other than an in-service test. - No weld inspection / NDE Testing has been included. - One mobilization has been included. Additional mobilization if required will incur additional costs. - No overtime / premium time has been included. - Pipeline can be isolated for the duration required to complete the scope of work. - Plant personnel will be responsible for isolation of areas as required to complete the scope of work. - Additional contract time will be required. A revised completion date will be mutually agreed to.
The URL can be used to link to this page
Your browser does not support the video tag.