Laserfiche WebLink
4 #122-043R City of South Bend Guardrail and Handrail Improvements Project <br />Division 3: Portage Ave at Lathrop St. <br />�� aT <br />BASE BID <br />Item No. <br />Line Item <br />Quantity <br />Unit <br />1 <br />MOBILIZATION/DEMOBILIZATION <br />1 <br />LSUM <br />2 <br />CPM SCHEDULE <br />1 <br />LSUM <br />3 <br />CPM SCHEDULE, MONTHLY UPDATE <br />3 <br />EACH <br />4 <br />VIDEO RECORD <br />1 <br />LSUM <br />5 <br />GUARDRAIL, REMOVE <br />40 <br />LFT <br />6 <br />SKT-SP GUARDRAIL END TREATMENT, 31 IN HEIGHT, 12.5 LFT <br />2 <br />EACH <br />7 <br />GUARDRAIL, W-BEAM, 31 IN HEIGHT, 6'-3" POST SPACING <br />12.5 <br />LFT <br />8 <br />RESET EXISTING DELINEATOR POST "TURF POST" <br />4 <br />EACH <br />9 <br />NEW DELINEATOR POST, "TURF POST" <br />1 <br />EACH <br />10 <br />GUARDRAIL REFLECTOR, 2-WAY <br />3 <br />EACH <br />11 <br />TOPSOIL, 6" T HICK <br />50 <br />SYS <br />12 <br />MULCHED SEEDING, TYPE'U' <br />50 <br />SYS <br />BASE BID TOTAL <br />Engineer's Estimate <br />LaPorte Construction Co., <br />Inc. <br />Unit Price <br />Cost <br />Unit Price <br />Cost <br />$1,650.00 <br />$1,650.00 <br />$ <br />1,604.00 <br />$ <br />1,604.00 <br />$1,000.00 <br />$1,000.00 <br />$ <br />700.00 <br />$ <br />700.00 <br />$250.00 <br />$750.00 <br />$ <br />500.00 <br />$ <br />1,500.00 <br />$500.00 <br />$500.00 <br />$ <br />1,000.00 <br />$ <br />1,000.00 <br />$10.00 <br />$400.00 <br />$ <br />160.00 <br />$ <br />6,400.00 <br />$12,500.00 <br />$25,000.00 <br />$ <br />5,470.00 <br />$ <br />10,940.00 <br />$160.00 <br />$2,000.00 <br />$ <br />98.00 <br />$ <br />1,225.00 <br />$100.00 <br />$400.00 <br />$ <br />506.00 <br />$ <br />2,024.00 <br />$500.00 <br />$500.00 <br />$ <br />568.00 <br />$ <br />568.00 <br />$50.00 <br />$150.00 <br />352.00 <br />1,056.00 <br />$30.00 <br />$1,500.00 <br />$ <br />46.001 <br />$ <br />2,300.00 <br />$10.00 <br />$500.00 <br />$ <br />23.00 <br />$ <br />1,150.00 <br />$34,350.00 <br />$ <br />30,467.00 <br />