BID TABULATION #122-043R
<br />#122-04311 City of South Bend Guardrail and Handrail Improvements Project
<br />Division 1: Gertrude St. at Chippewa Ave
<br />BASE BID
<br />Item No.
<br />Line Item
<br />Quantity
<br />Unit
<br />1
<br />MOBILIZATION/DEMOBILIZATION
<br />1
<br />LSUM
<br />2
<br />CPM SCHEDULE
<br />1
<br />LSUM
<br />3
<br />CPM SCHEDULE, MONTHLY UPDATE
<br />3
<br />EACH
<br />4
<br />VIDEO RECORD
<br />1
<br />LSUM
<br />5
<br />CLEARING RIGHT-OF-WAY
<br />1
<br />LSUM
<br />6
<br />SITE GRADING
<br />1
<br />LSUM
<br />7
<br />GUARDRAIL, W-BEAM, 31 IN HEIGHT, 6'3" POST SPACING
<br />87.5
<br />LFT
<br />8
<br />GUARDRAIL END TREATMENT, TYPE 1
<br />1
<br />EACH
<br />9
<br />W-BEAM CURVED GUARDRAIL 90° BEND, 31" HEIGHT, 8.5 FT RADIUS
<br />1
<br />EACH
<br />10
<br />W-BEAM CURVED GUARDRAIL TERMINAL END
<br />1
<br />EACH
<br />11
<br />GUARDRAIL REFLECTOR, TWO-WAY
<br />15
<br />EACH
<br />12
<br />SHEET SIGN, REFLECTIVE WITH LEGEND "3M DIAMOND GRADE", 0.10 IN THICK
<br />64
<br />SFT
<br />13
<br />SIGNPOST, SQUARE STEEL, TYPE 1
<br />126
<br />LFT
<br />14
<br />REFLECTIVE POST PANEL, YELLOW, "3M DIAMOND GRADE", 3 IN X 60 IN
<br />45
<br />LFT
<br />15
<br />TOPSOIL, 6 IN THICK
<br />70
<br />SYS
<br />16
<br />MULCHED SSEEDING, TYPE'U'
<br />70
<br />SYS
<br />BASE BID TOTAL
<br />Engineer's Estimate
<br />LaPorte Construction
<br />Co., Inc.
<br />Unit Price
<br />Cost
<br />Unit Price
<br />Cost
<br />$2,820.00
<br />$2,820.00
<br />$
<br />3,734.00
<br />$
<br />3,734.00
<br />$1,000.00
<br />$1,000.00
<br />$
<br />700.00
<br />$
<br />700.00
<br />$250.00
<br />$750.00
<br />$
<br />500.00
<br />$
<br />1,500.00
<br />$500.00
<br />$500.00
<br />$
<br />1,000.00
<br />$
<br />1,000.00
<br />$9,500.00
<br />$9,500.00
<br />$
<br />6,340.00
<br />$
<br />6,340.00
<br />$9,500.00
<br />$9,500.00
<br />$
<br />5,732.00
<br />$
<br />5,732.00
<br />$100.00
<br />$8,750.00
<br />$
<br />48.00
<br />$
<br />4,200.00
<br />$4,000.00
<br />$4,000.00
<br />$
<br />3,230.00
<br />$
<br />3,230.00
<br />$2,000.00
<br />$2,000.00
<br />$
<br />1,185.00
<br />$
<br />1,185.00
<br />$500.00
<br />$500.00
<br />$
<br />471.00
<br />$
<br />471.00
<br />$50.00
<br />$750.00
<br />$
<br />314.00
<br />$
<br />4,710.00
<br />$90.00
<br />$5,760.00
<br />$
<br />51.00
<br />$
<br />3,264.00
<br />$50.00
<br />$6,300.00
<br />$
<br />52.00
<br />$
<br />6,552.00
<br />$50.00
<br />$2,250.00
<br />$
<br />63.00
<br />$
<br />2,835.00
<br />$30.00
<br />$2,100.00
<br />$
<br />42.00
<br />$
<br />2,940.00
<br />$10.00
<br />$700.00
<br />$
<br />20.00
<br />$
<br />1,400.00
<br />$57,180.00
<br />$
<br />49,793.00
<br />I hereby certify that the above truly and accurately represents bids received for this project on December 12, 2023
<br />11 eaz_al�
<br />Mark Wilson, Professional Engineer
<br />i`