Laserfiche WebLink
BID TABULATION #122-043R <br />#122-04311 City of South Bend Guardrail and Handrail Improvements Project <br />Division 1: Gertrude St. at Chippewa Ave <br />BASE BID <br />Item No. <br />Line Item <br />Quantity <br />Unit <br />1 <br />MOBILIZATION/DEMOBILIZATION <br />1 <br />LSUM <br />2 <br />CPM SCHEDULE <br />1 <br />LSUM <br />3 <br />CPM SCHEDULE, MONTHLY UPDATE <br />3 <br />EACH <br />4 <br />VIDEO RECORD <br />1 <br />LSUM <br />5 <br />CLEARING RIGHT-OF-WAY <br />1 <br />LSUM <br />6 <br />SITE GRADING <br />1 <br />LSUM <br />7 <br />GUARDRAIL, W-BEAM, 31 IN HEIGHT, 6'3" POST SPACING <br />87.5 <br />LFT <br />8 <br />GUARDRAIL END TREATMENT, TYPE 1 <br />1 <br />EACH <br />9 <br />W-BEAM CURVED GUARDRAIL 90° BEND, 31" HEIGHT, 8.5 FT RADIUS <br />1 <br />EACH <br />10 <br />W-BEAM CURVED GUARDRAIL TERMINAL END <br />1 <br />EACH <br />11 <br />GUARDRAIL REFLECTOR, TWO-WAY <br />15 <br />EACH <br />12 <br />SHEET SIGN, REFLECTIVE WITH LEGEND "3M DIAMOND GRADE", 0.10 IN THICK <br />64 <br />SFT <br />13 <br />SIGNPOST, SQUARE STEEL, TYPE 1 <br />126 <br />LFT <br />14 <br />REFLECTIVE POST PANEL, YELLOW, "3M DIAMOND GRADE", 3 IN X 60 IN <br />45 <br />LFT <br />15 <br />TOPSOIL, 6 IN THICK <br />70 <br />SYS <br />16 <br />MULCHED SSEEDING, TYPE'U' <br />70 <br />SYS <br />BASE BID TOTAL <br />Engineer's Estimate <br />LaPorte Construction <br />Co., Inc. <br />Unit Price <br />Cost <br />Unit Price <br />Cost <br />$2,820.00 <br />$2,820.00 <br />$ <br />3,734.00 <br />$ <br />3,734.00 <br />$1,000.00 <br />$1,000.00 <br />$ <br />700.00 <br />$ <br />700.00 <br />$250.00 <br />$750.00 <br />$ <br />500.00 <br />$ <br />1,500.00 <br />$500.00 <br />$500.00 <br />$ <br />1,000.00 <br />$ <br />1,000.00 <br />$9,500.00 <br />$9,500.00 <br />$ <br />6,340.00 <br />$ <br />6,340.00 <br />$9,500.00 <br />$9,500.00 <br />$ <br />5,732.00 <br />$ <br />5,732.00 <br />$100.00 <br />$8,750.00 <br />$ <br />48.00 <br />$ <br />4,200.00 <br />$4,000.00 <br />$4,000.00 <br />$ <br />3,230.00 <br />$ <br />3,230.00 <br />$2,000.00 <br />$2,000.00 <br />$ <br />1,185.00 <br />$ <br />1,185.00 <br />$500.00 <br />$500.00 <br />$ <br />471.00 <br />$ <br />471.00 <br />$50.00 <br />$750.00 <br />$ <br />314.00 <br />$ <br />4,710.00 <br />$90.00 <br />$5,760.00 <br />$ <br />51.00 <br />$ <br />3,264.00 <br />$50.00 <br />$6,300.00 <br />$ <br />52.00 <br />$ <br />6,552.00 <br />$50.00 <br />$2,250.00 <br />$ <br />63.00 <br />$ <br />2,835.00 <br />$30.00 <br />$2,100.00 <br />$ <br />42.00 <br />$ <br />2,940.00 <br />$10.00 <br />$700.00 <br />$ <br />20.00 <br />$ <br />1,400.00 <br />$57,180.00 <br />$ <br />49,793.00 <br />I hereby certify that the above truly and accurately represents bids received for this project on December 12, 2023 <br />11 eaz_al� <br />Mark Wilson, Professional Engineer <br />i` <br />