Laserfiche WebLink
ProjectCalculatedGoals BaseBidProjectNumberMBE 2.2%BidOpenWBE 4.7%ConditionalFormatting;green=meetsgoals,red=doesnotmeetgoals662,940.00$691,539.00$MBEName MBEInformationScopeofWorkDollarAmountofMBEComponentBidderClaimedPercentageofTotalBidCheckedPercentageofTotalBidMBEName MBEInformationScopeofWorkDollarAmountofMBEComponentBidderClaimedPercentageofTotalBidCheckedPercentageofTotalBidC.LeeConstructionServices ChipLee,(219)922Ͳ7733 Hauling14,600.00$2.20% 2.20%V&RTrucking,Inc.VedaGodette,(574)234Ͳ1268 Trucking13,300.00$1.90% 1.92%0.00%CLeeConstructionServices Trucking,Asphalt Trucking,Asphalt2,000.00$0.30% 0.29%TotalMBE% 2.20% 2.20%TotalMBE% 2.20% 2.21%WBEName WBEInformationScopeofWorkDollarAmountofWBEComponentBidderClaimedPercentageofTotalBidCheckedPercentageofTotalBidWBEName WBEInformationScopeofWorkDollarAmountofWBEComponentBidderClaimedPercentageofTotalBidCheckedPercentageofTotalBidV&RTrucking,Inc.VedaGodette,(574)234Ͳ1268 Hauling27,160.00$4.10% 4.10%StateBarricading,Inc.JamesMichawlski,(574)287Ͳ2078 TrafficControl7,890.00$1.20% 1.141%C.E.HughesMilling,IncCarolineHughes,(812)725Ͳ8665 Striping4,000.00$1% 0.60%BUCConstruction,Inc.TeresaButler,(765)412Ͳ3484 Castings15,816.00$2.30% 2.287%TotalWBE% 4.70% 4.70%Airmarking NickRelias,(574)223Ͳ5817 PavementMarkings4,000.00$0.50% 0.58%CEHughesCarolineHughes,(812)725Ͳ8665 Milling4,800.00$0.70% 0.69%TotalWBE% 4.70% 4.70%IncludedwithBid?Complete?FormMBEͲ2.0yes yesFormWBEͲ2.0 yes yesIncludedwithBid?Complete?FormMBEͲ2.1 yes yes FormMBEͲ2.0yes noFormWBEͲ2.1yes yes FormWBEͲ2.0yes noFormMBEͲ2.1 yes yesFormWBEͲ2.1yes yesWBEContactedMBEContactedWBEContactedEvidenceofGoodFaithEffortsEvidenceofGoodFaithEffortsMBEContactedBercliffEstatesSewerSeparation122Ͳ016C12/14/2023EvidenceofGoodFaithEffortsEvidenceofGoodFaithEffortsBaseScopeofWorkͲHRPBaseBidAmount(fromMWBE1.0,checkthatthismatchesbidtabtotal)MBEUtilizationͲForm1.0WBEUtilizationͲForm1.0WBEUtilizationͲForm1.0BaseScopeofWorkͲMilestoneMBEUtilizationͲForm1.0BaseBidAmount(fromMWBE1.0,checkthatthismatchesbidtabtotal)