Laserfiche WebLink
BIDTABULATIONBercliffEstatesSewerSeparationProjectNo:122Ͳ016CBercliffEstatesSewerSeparationItemNo.LineItem Quantity UnitUnitPrice Cost UnitPrice Cost UnitPrice Cost1 Mobilization/Demobilization 1LS 32,610.40$32,610.40$9,507.50$9,507.50$34,600.00$34,600.00$2 ClearingRightofWay1LS 7,500.00$7,500.00$10,600.00$10,600.00$69,250.00$69,250.00$3 Tree,Remove24"Ͳ30"7EA 3,000.00$21,000.00$1,800.00$12,600.00$1,800.00$12,600.00$4 Tree,ProtectionandTrimming 1LS 2,000.00$2,000.00$800.00$800.00$4,500.00$4,500.00$5 StructuresandObstructions,Remove 1LS 15,000.00$15,000.00$8,100.00$8,100.00$20,250.00$20,250.00$6Pipe,Remove300LFT 25.00$7,500.00$26.00$7,800.00$14.00$4,200.00$7Fence,WoodenPrivacyGate,6ftHeight,RemoveandReset 45LFT 100.00$4,500.00$83.00$3,735.00$74.00$3,330.00$8 Excavation,Common 719CYS 30.00$21,570.00$64.00$46,016.00$86.00$61,834.00$9 Embankment22CYS 100.00$2,200.00$100.00$2,200.00$75.00$1,650.00$10 TemporaryErosionControlMeasures,InletProtection 13EA 250.00$3,250.00$400.00$5,200.00$225.00$2,925.00$11 TemporaryErosionControlMeasures,SiltFence 670LFT 3.00$2,010.00$5.00$3,350.00$4.50$3,015.00$12 TemporaryErosionControlMeasures,FilterSock 60LFT 6.00$360.00$7.00$420.00$6.50$390.00$13 CompactedAggregate,No.53 750TON 75.00$56,250.00$60.00$45,000.00$55.00$41,250.00$14 HMASurface,TypeB160TON 200.00$32,000.00$124.00$19,840.00$124.00$19,840.00$15 HMAIntermediate,TypeB 265TON 150.00$39,750.00$113.00$29,945.00$113.00$29,945.00$16 HMABase,TypeB420TON 150.00$63,000.00$97.00$40,740.00$97.00$40,740.00$17 AsphaltforPrimeCoat5TON 600.00$3,000.00$550.00$2,750.00$550.00$2,750.00$18 AsphaltforTackCoat1TON 600.00$600.00$1,200.00$1,200.00$1,200.00$1,200.00$19 PCCP,6",forDriveways 174SYS 130.00$22,620.00$105.00$18,270.00$105.00$18,270.00$20 Curb,Concrete500LFT 45.00$22,500.00$40.00$20,000.00$40.00$20,000.00$21 MailboxAssembly,Single 8EA 275.00$2,200.00$480.00$3,840.00$250.00$2,000.00$22 Riprap,ClassI40TON 120.00$4,800.00$135.00$5,400.00$157.00$6,280.00$23 GeotextileforRiprap,Type2B 70SYS 10.00$700.00$8.00$560.00$20.00$1,400.00$24 MulchedSeeding,U 1,345SYS 5.00$6,725.00$9.70$13,046.50$5.00$6,725.00$25 PlantGrowthLayer150CYS 90.00$13,500.00$110.30$16,545.00$105.00$15,750.00$26 Plant,DeciduousTree,SingleStem2.5IN.to6IN.9EA 600.00$5,400.00$700.00$6,300.00$650.00$5,850.00$27 StormPipe,Type2,Circular12IN 127LFT 100.00$12,700.00$69.00$8,763.00$75.00$9,525.00$28 StormPipe,Type2,Circular18IN 83LFT 125.00$10,375.00$95.00$7,885.00$90.00$7,470.00$29 StormPipe,RCP,Circular24IN 624LFT 200.00$124,800.00$285.00$177,840.00$115.00$71,760.00$30 StormPipe,RCP,Circular24IN 33LFT 100.00$3,300.00$92.00$3,036.00$85.00$2,805.00$31 VideoInspectionforPipe 854LFT 3.00$2,562.00$3.00$2,562.00$2.50$2,135.00$32 Inlet,TypeA4EA 2,000.00$8,000.00$4,300.00$17,200.00$6,500.00$26,000.00$33 Inlet,TypeC1EA 3,000.00$3,000.00$8,700.00$8,700.00$7,500.00$7,500.00$34 Manhole,TypeB,4FTBarrel 8EA 7,500.00$60,000.00$7,100.00$56,800.00$9,250.00$74,000.00$35 Manhole,TypeB,5FTBarrel 1EA 18,000.00$18,000.00$11,200.00$11,200.00$13,000.00$13,000.00$36 Manhole,TypeB4,6FTBarrel 1EA 25,000.00$25,000.00$14,100.00$14,100.00$15,000.00$15,000.00$37 Structure,Sanitary,AdjustCastingtoGrade 3EA 1,500.00$4,500.00$1,000.00$3,000.00$600.00$1,800.00$38 MaintenanceofTraffic1LS 5,000.00$5,000.00$4,689.00$4,689.00$10,000.00$10,000.00$39 SpeedHump1EA 15,000.00$15,000.00$13,400.00$13,400.00$20,000.00$20,000.00$TOTAL684,782.40$662,940.00$691,539.00$I hereby certify that the above truly and accurately represents bids received for this project on December 12, 2023.Becca Plantz, PE, Senior Project EngineerHRPConstruction,Inc.Engineer'sEstimateMilestoneContractorsNorth,Inc.S:\PublicWorks\Projects\ProjectsbyYear\2022Projects\122Ͳ016McCormickOnͲCall\1ͲAdmin\1ͲBPWDocuments\BercliffEstates\BidTabulation,MWBE&Review122Ͳ016C