Laserfiche WebLink
BID TABULATION <br />Bercliff Estates Sewer Separation <br />Project No: 122-016C <br />Bercliff Estates Sewer Separation <br />Engineer's Estimate <br />Milestone Contractors North, <br />Inc. <br />HRP Construction, Inc. <br />Item No. <br />Line Item <br />Quantity <br />Unit <br />Unit Price <br />Cost <br />Unit Price <br />Cost <br />Unit Price <br />Cost <br />1 <br />Mobilization/Demobilization <br />1 <br />LS <br />$ 32,610.40 <br />$ 32,610.40 <br />$ 9,507.50 <br />$ 9,507.50 <br />$ 34,600.00 <br />$ 34,600.00 <br />2 <br />Clearing Right of Way <br />1 <br />LS <br />$ 7,500.00 <br />$ 7,500.00 <br />$ 10,600.00 <br />$ 10,600.00 <br />$ 69,250.00 <br />$ 69,250.00 <br />3 <br />Tree, Remove 24"-30" <br />7 <br />EA <br />$ 3,000.00 <br />$ 21,000.00 <br />$ 1,800.00 <br />$ 12,600.00 <br />$ 1,800.00 <br />$ 12,600.00 <br />4 <br />Tree, Protection and Trimming <br />1 <br />LS <br />$ 2,000.00 <br />$ 2,000.00 <br />$ 800.00 <br />$ 800.00 <br />$ 4,500.00 <br />$ 4,500.00 <br />5 <br />Structures and Obstructions, Remove <br />1 <br />LS <br />$ 15,000.00 <br />$ 15,000.00 <br />$ 8,100.00 <br />$ 8,100.00 <br />$ 20,250.00 <br />$ 20,250.00 <br />6 <br />Pipe, Remove <br />300 <br />LFT <br />$ 25.00 <br />$ 7,500.00 <br />$ 26.00 <br />$ 7,800.00 <br />$ 14.00 <br />$ 4,200.00 <br />7 <br />Fence, Wooden Privacy Gate, 6 ft Height, Remove and Reset <br />45 <br />LFT <br />$ 100.00 <br />$ 4,500.00 <br />$ 83.00 <br />$ 3,735.00 <br />$ 74.00 <br />$ 3,330.00 <br />8 <br />Excavation, Common <br />719 <br />CYS <br />$ 30.00 <br />$ 21,570.00 <br />$ 64.00 <br />$ 46,016.00 <br />$ 86.00 <br />$ 61,834.00 <br />9 <br />Embankment <br />22 <br />CYS <br />$ 100.00 <br />$ 2,200.00 <br />$ 100.00 <br />$ 2,200.00 <br />$ 75.00 <br />$ 1,650.00 <br />10 <br />Temporary Erosion Control Measures, Inlet Protection <br />13 <br />EA <br />$ 250.00 <br />$ 3,250.00 <br />$ 400.00 <br />$ 5,200.00 <br />$ 225.00 <br />$ 2,925.00 <br />11 <br />Temporary Erosion Control Measures, Silt Fence <br />670 <br />LFT <br />$ 3.00 <br />$ 2,010.00 <br />$ 5.00 <br />$ 3,350.00 <br />$ 4.50 <br />$ 3,015.00 <br />12 <br />Temporary Erosion Control Measures, Filter Sock <br />60 <br />LFT <br />$ 6.00 <br />$ 360.00 <br />$ 7.00 <br />$ 420.00 <br />$ 6.50 <br />$ 390.00 <br />13 <br />Compacted Aggregate, No.53 <br />750 <br />TON <br />$ 75.00 <br />$ 56,250.00 <br />$ 60.00 <br />$ 45,000.00 <br />$ 55.00 <br />$ 41,250.00 <br />14 <br />HMA Surface, Type B <br />160 <br />TON <br />$ 200.00 <br />$ 32,000.00 <br />$ 124.00 <br />$ 19,840.00 <br />$ 124.00 <br />$ 19,840.00 <br />15 <br />HMA Intermediate, Type B <br />265 <br />TON <br />$ 150.00 <br />$ 39,750.00 <br />$ 113.00 <br />$ 29,945.00 <br />$ 113.00 <br />$ 29,945.00 <br />16 <br />HMA Base, Type B <br />420 <br />TON <br />$ 150.00 <br />$ 63,000.00 <br />$ 97.00 <br />$ 40,740.00 <br />$ 97.00 <br />$ 40,740.00 <br />17 <br />Asphalt for Prime Coat <br />5 <br />TON <br />$ 600.00 <br />$ 3,000.00 <br />$ 550.00 <br />$ 2,750.00 <br />$ 550.00 <br />$ 2,750.00 <br />18 <br />Asphalt for Tack Coat <br />1 <br />TON <br />$ 600.00 <br />$ 600.00 <br />$ 1,200.00 <br />$ 1,200.00 <br />$ 1,200.00 <br />$ 1,200.00 <br />19 <br />PCCP, 6", for Driveways <br />174 <br />SYS <br />$ 130.00 <br />$ 22,620.00 <br />$ 105.00 <br />$ 18,270.00 <br />$ 105.00 <br />$ 18,270.00 <br />20 <br />Curb, Concrete <br />500 <br />LFT <br />$ 45.00 <br />$ 22,500.00 <br />$ 40.00 <br />$ 20,000.00 <br />$ 40.00 <br />$ 20,000.00 <br />21 <br />Mailbox Assembly, Single <br />8 <br />EA <br />$ 275.00 <br />$ 2,200.00 <br />$ 480.00 <br />$ 3,840.00 <br />$ 250.00 <br />$ 2,000.00 <br />22 <br />Riprap, Class 1 <br />40 <br />TON <br />$ 120.00 <br />$ 4,800.00 <br />$ 135.00 <br />$ 5,400.00 <br />$ 157.00 <br />$ 6,280.00 <br />23 <br />Geotextile for Riprap, Type 2B <br />70 <br />SYS <br />$ 10.00 <br />$ 700.00 <br />$ 8.00 <br />$ 560.00 <br />$ 20.00 <br />$ 1,400.00 <br />24 <br />Mulched Seeding, U <br />1,345 <br />SYS <br />$ 5.00 <br />$ 6,725.00 <br />$ 9.70 <br />$ 13,046.50 <br />$ 5.00 <br />$ 6,725.00 <br />25 <br />Plant Growth Layer <br />150 <br />CYS <br />$ 90.00 <br />$ 13,500.00 <br />$ 110.30 <br />$ 16,545.00 <br />$ 105.00 <br />$ 15,750.00 <br />26 <br />Plant, Deciduous Tree, Single Stem 2.5 IN. to 6 IN. <br />9 <br />EA <br />$ 600.00 <br />$ 5,400.00 <br />$ 700.00 <br />$ 6,300.00 <br />$ 650.00 <br />$ 5,850.00 <br />27 <br />Storm Pipe, Type 2, Circular 12 IN <br />127 <br />LFT <br />$ 100.00 <br />$ 12,700.00 <br />$ 69.00 <br />$ 8,763.00 <br />$ 75.00 <br />$ 9,525.00 <br />28 <br />Storm Pipe, Type 2, Circular 181N <br />83 <br />LFT <br />$ 125.00 <br />$ 10,375.00 <br />$ 95.00 <br />$ 7,885.00 <br />$ 90.00 <br />$ 7,470.00 <br />29 <br />Storm Pipe, RCP, Circular 241N <br />624 <br />LFT <br />$ 200.00 <br />$ 124,800.00 <br />$ 285.00 <br />$ 177,840.00 <br />$ 115.00 <br />$ 71,760.00 <br />30 <br />Storm Pipe, RCP, Circular 241N <br />33 <br />LFT <br />$ 100.00 <br />$ 3,300.00 <br />$ 92.00 <br />$ 3,036.00 <br />$ 85.00 <br />$ 2,805.00 <br />31 <br />Video Inspection for Pipe <br />854 <br />LFT <br />$ 3.00 <br />$ 2,562.00 <br />$ 3.00 <br />$ 2,562.00 <br />$ 2.50 <br />$ 2,135.00 <br />32 <br />Inlet, Type A <br />4 <br />EA <br />$ 2,000.00 <br />$ 8,000.00 <br />$ 4,300.00 <br />$ 17,200.00 <br />$ 6,500.00 <br />$ 26,000.00 <br />33 <br />Inlet, Type C <br />1 <br />EA <br />$ 3,000.00 <br />$ 3,000.00 <br />$ 8,700.00 <br />$ 8,700.00 <br />$ 7,500.00 <br />$ 7,500.00 <br />34 <br />Manhole, Type B, 4 FT Barrel <br />8 <br />EA <br />$ 7,500.00 <br />$ 60,000.00 <br />$ 7,100.00 <br />$ 56,800.00 <br />$ 9,250.00 <br />$ 74,000.00 <br />35 <br />Manhole, Type B, S FT Barrel <br />1 <br />EA <br />$ 18,000.00 <br />$ 18,000.00 <br />$ 11,200.00 <br />$ 11,200.00 <br />$ 13,000.00 <br />$ 13,000.00 <br />36 <br />Manhole, Type B4, 6 FT Barrel <br />1 <br />EA <br />$ 25,000.00 <br />$ 25,000.00 <br />$ 14,100.00 <br />$ 14,100.00 <br />$ 15,000.00 <br />$ 15,000.00 <br />37 <br />Structure, Sanitary, Adjust Casting to Grade <br />3 <br />EA <br />$ 1,500.00 <br />$ 4,500.00 <br />$ 1,000.00 <br />$ 3,000.00 <br />$ 600.00 <br />$ 1,800.00 <br />38 <br />Maintenance of Traffic <br />1 <br />LS <br />$ 5,000.00 <br />$ 5,000.00 <br />$ 4,689.00 <br />$ 4,689.00 <br />$ 10,000.00 <br />$ 10,000.00 <br />39 <br />Speed Hump <br />1 <br />EA <br />$ 15,000.00 <br />$ 15,000.00 <br />$ 13,400.00 <br />$ 13,400.00 <br />$ 20,000.00 <br />$ 20,000.00 <br />TOTAL <br />1 $ 684,782.40 <br />$ 662,940.00 <br />$ 691,539.00 <br />I hereby certify that the above truly and accurately represents bids received for this project on December 12, 2023. <br />1_11L 1- " <br />Becca Plantz, PE, Senior Project Engineer <br />5:\Public Works\Projects\Projects by Year\2022 Projects\122-016 McCormick C n-Call\I -Ad min\I - BPW Documents\Bercliff Estates\Bid Tabulation, MW BE & Review 122-016C <br />