Laserfiche WebLink
<br /> <br />Advanced Engineering Consultants – Mechanical Electrical <br />MECHANICAL - ELECTRICAL - PLUMBING - FIRE PROTECTION - TECHNOLOGY <br />8606 Allisonville Rd, Suite 270 | Indianapolis, IN 46250 | P 317 413 5724 | aecmep.com <br />Page 4 of 5 <br />10. Addition submissions. <br /> <br />Assumptions: <br />1. Floor plans will not have significate changes beyond schematic design phase. If significant changes <br />are made, AEC-ME will have a minimum of (3) weeks to adjust their drawings to ensure they are <br />fully coordinated as well as an additional fee if significant redesign is required. <br />2. This fee proposal is based on a construction budget as noted above. If the construction budget is <br />increased this will likely have an impact on the effort required by AEC-ME and result in additional <br />services. <br />3. The life safety plans (including occupancy separations, fire assemblies, fire/smoke separations and <br />path of egress) and coordinated RCP will be determined by the Architect and provided to AEC-ME <br />at, or prior to, completion of Design Development phase. <br />4. Permits and application fees will be by others. <br />5. Project will be Bid in a single phase and one package. <br />6. Cost estimating will be completed by others outside this contract. Review of budgets or cost <br />estimates associated with the design are not included in this fee. <br />7. Floor plans and occupancy information will be made available for our use. <br />8. If air or water flow and temperature information is required, it will be provided by the owner or <br />services will be procured by a 3rd party. We have not included any fee for this. <br />9. The design of a commercial kitchen is not anticipated for this project. <br />10. A complete list of Owner-furnished equipment will be provided to AEC-ME, along with utility <br />connection locations, utility loads, heat dissipated to the space, disconnect requirement, start-stop <br />controls, and other contractor coordination issues, prior to 25% completion of construction <br />documents. Information on occupancy, loading, and associated personal/office equipment for each <br />space will be provided to AEC-ME prior to completion of the Design Development phase. <br />11. Documents prepared by the Engineer will be prepared based upon reasonable assumptions derived <br />from existing information provided by the Owner and from limited observation of accessible and <br />visible existing conditions by the Engineer without the benefit of extensive field measurements and <br />investigation prohibited by expense and inconvenience to the Owner. It is understood and agreed that <br />unforeseen conditions uncovered during the progress of the project may require changes in the <br />project, resulting in additional cost and delay. <br />12. Coordination with technology utility service providers and any service options and or plans, their <br />requirements, deliverables, and schedule is anticipated to be by others. <br />13. We anticipate REVIT model will be hosted on Autodesk’s BIM 360 cloud to aid in efficient loading <br />and coordination of working model. <br />14. Arc Flash and Electrical power systems coordination study are not included in this proposal. <br /> <br />Compensation: <br />In consideration of the Design Services and the Project Scope, AEC-ME shall be compensated the following <br />lump-sum amount. <br /> <br />Engineering Services – MEP/FP Assessment <br /> <br />Total: $7,500.00 Initial if accepted __________ <br /> <br />Engineering Services - Schematic Design of MEP/FP (includes the MEP/FP Assessment above) <br /> <br />Total: $11,500.00 Initial if accepted __________ <br /> <br />   <br />     <br />