My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction Contract - LTCP WWTP Improvements Proj No. 121-071 – Bowen Engineering Corp.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
Construction Contract - LTCP WWTP Improvements Proj No. 121-071 – Bowen Engineering Corp.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 8:56:23 AM
Creation date
12/12/2023 1:42:18 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
12/12/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.07 Change Orders <br />A. Owner is obligated to execute Change Orders as indicated in Paragraph 10.03. <br />8.08 Inspections, Tests, and Approvals <br />A. Owner's responsibility with respect to certain inspections, tests, and approvals is set forth in <br />Paragraph 13.03.B. <br />8.09 Limitations on Owner's Responsibilities <br />A. The Owner shall not supervise, direct, or have control or authority over, nor be responsible for, <br />Contractor's means, methods, techniques, sequences, or procedures of construction, or the safety <br />precautions and programs incident thereto, or for any failure of Contractor to comply with Laws <br />and Regulations applicable to the performance of the Work. Owner will not be responsible for <br />Contractor's failure to perform the Work in accordance with the Contract Documents. <br />8.10 Undisclosed Hazardous Environmental Condition <br />A. Owner's responsibility in respect to an undisclosed Hazardous Environmental Condition is set <br />forth in Paragraph 4.06. <br />8.11 Evidence of Financial Arrangements <br />A. Upon written request of Contractor and prior to the start of performance of the work, Owner shall <br />furnish Contractor reasonable evidence that financial arrangements have been made to satisfy <br />Owner's obligations under the Contract Documents. <br />8.12 Compliance with Safety Program <br />A. While at the Site, Owner's employees and representatives shall comply with the specific <br />applicable requirements of Contractor's safety programs of which Owner has been informed <br />pursuant to Paragraph 6.13.D. <br />ARTICLE 9 — ENGINEER'S STATUS DURING CONSTRUCTION <br />9.01 Owner's Representative <br />A. Engineer will be Owner's representative during the construction period. The duties and <br />responsibilities and the limitations of authority of Engineer as Owner's representative during <br />construction are set forth in the Contract Documents. <br />9.02 Visits to Site <br />A. Engineer will make visits to the Site at intervals appropriate to the various stages of construction <br />as Engineer deems necessary in order to observe as an experienced and qualified design <br />professional the progress that has been made and the quality of the various aspects of <br />Contractor's executed Work. Based on information obtained during such visits and observations, <br />Engineer, for the benefit of Owner, will determine, in general, if the Work is proceeding in <br />EJCDC C-700 Standard General Conditions of the Construction Contract <br />Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved. <br />Page 37 of 62 <br />
The URL can be used to link to this page
Your browser does not support the video tag.