My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction Contract - LTCP WWTP Improvements Proj No. 121-071 – Bowen Engineering Corp.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
Construction Contract - LTCP WWTP Improvements Proj No. 121-071 – Bowen Engineering Corp.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 8:56:23 AM
Creation date
12/12/2023 1:42:18 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
12/12/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
B. Unless otherwise provided in the Supplementary Conditions, Owner shall have sole authority and <br />responsibility for such coordination. <br />7.03 Legal Relationships <br />A. Paragraphs 7.01.A and 7.02 are not applicable for utilities not under the control of Owner. <br />B. Each other direct contract of Owner under Paragraph 7.01.A shall provide that the other <br />contractor is liable to Owner and Contractor for the reasonable direct delay and disruption costs <br />incurred by Contractor as a result of the other contractor's wrongful actions or inactions. <br />C. Contractor shall be liable to Owner and any other contractor under direct contract to Owner for <br />the reasonable direct delay and disruption costs incurred by such other contractor as a result of <br />Contractor's wrongful action or inactions. <br />ARTICLE 8 — OWNER'S RESPONSIBILITIES <br />8.01 Communications to Contractor <br />A. Except as otherwise provided in these General Conditions, Owner shall normally issue all <br />communications to Contractor through Engineer, unless the circumstances require otherwise. <br />8.02 Replacement of Engineer <br />A. In case of termination of the employment of Engineer, Owner shall appoint an engineer to whom <br />Contractor makes no reasonable objection, whose status under the Contract Documents shall be <br />that of the former Engineer. <br />8.03 Furnish Data <br />A. Owner shall promptly furnish the data required of Owner under the Contract Documents. <br />8.04 Pay When Due <br />A. Owner shall make payments to Contractor when they are due as provided in Paragraphs 14.02.0 <br />and 14.07.C. <br />8.05 Lands and Easements; Reports and Tests <br />A. Owner's duties with respect to providing lands and easements and providing engineering surveys <br />to establish reference points are set forth in Paragraphs 4.01 and 4.05. Paragraph 4.02 refers to <br />Owner's identifying and making available to Contractor copies of reports of explorations and <br />tests of subsurface conditions and drawings of physical conditions relating to existing surface or <br />subsurface structures at the Site. <br />8.06 Insurance <br />A. Owner's responsibilities, if any, with respect to purchasing and maintaining liability and property <br />insurance are set forth in Article 5. <br />EJCDC C-700 Standard General Conditions of the Construction Contract <br />Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved. <br />Page 36 of 62 <br />
The URL can be used to link to this page
Your browser does not support the video tag.