My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - Northwest Elevated Tank Valve Vault Coating Proj No. 122-018B - Jetco, Ltd.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Quotations/Proposals
>
Opening of Quotes - Northwest Elevated Tank Valve Vault Coating Proj No. 122-018B - Jetco, Ltd.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 1:32:06 PM
Creation date
12/12/2023 1:31:54 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/12/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Version 9/29/2021 Page - 7 Public Works Quote <br />coating system to be completed with an OWNER’s representative present, and document the <br />conditions for inclusion in the final inspection reports. <br /> <br />XVIII. MISCELLANEOUS REPAIRS <br /> <br />A. Prevailing Specifications: City of South Bend CONSTRUCTION STANDARDS AND SPECIFICATIONS <br />B. Additions: <br /> <br />1. FAA Obstruction Light: Remove and replace the FG3000 Flashing Dual Strobe System bulb, lens <br />cover, and any other miscellaneous components required to replace the bulb. Salvage the existing <br />lens cover for the Owner to decide on shelving or disposing of the lens. <br />2. Hinge repair: Repair or remove and replace the broken hinge on the hatch door to the valve vault. <br />a. Unless otherwise communicated, connections shall be all-bolted bearing type, using bolts and <br />nuts equipped with helical lock washer under the stationary element (bolt head or nut) and a <br />flat washer under the turned element. Bolts and nuts for structural aluminum connections shall <br />be stainless steel. A sufficient number of bolts shall be provided in each connection to develop <br />the shear strength of the members. <br /> <br />XIX. PLANS <br /> <br />A. Prevailing Specifications: City of South Bend CONSTRUCTION STANDARDS AND SPECIFICATIONS <br />B. Additions: <br /> <br />1. The plans consist of Appendix A – Existing Northwest Elevated Tank Construction Drawings <br />with 3 sheets and Appendix B – Photograph Log of Existing Conditions with 2 Sheets. <br />2. The drawings are schematic in nature. <br />3. The CONTRACTOR is responsible for estimating dimensions and quantities of materials. <br />4. In the event that the Special Provisions and the Plans conflict, the Special Provisions shall govern. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.