My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LPA Consulting Contract - Coal Line Trail – Lochmueller Group, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
LPA Consulting Contract - Coal Line Trail – Lochmueller Group, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 9:02:43 AM
Creation date
11/29/2023 10:36:14 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
11/28/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Wive, Review, and Develop Contract Documen <br />Coordinate and Conduct Utility Constructability Reviews <br />2024 <br />8 <br />4 <br />12 <br />$564.25 <br />Coordinate, Review, and Approve Utility Work Plans <br />2024 <br />8 <br />4 <br />12 <br />$564.25 <br />Develop Utility Relocation Schedule and Constructability Risk Assessment <br />2024 <br />8 <br />S <br />$418.38 <br />Develop Utility Special Provisions and Contract Deliverables <br />2024 <br />6 <br />2 <br />S <br />$386.72 <br />Construction Phase Utility Coordination <br />Distribute Utility Relocation Notice to Proceeds <br />2025 <br />6 <br />6 $328.53 <br />Coordinate and Track Utility Relocations <br />2025 <br />6 <br />6 <br />12 <br />$557.62 <br />Attend Construction Progress Meetings <br />2025 <br />2 <br />2 <br />$109.51 <br />Issue Letter Completion of Work Plans <br />2025 <br />0 <br />$0.00 <br />Submit Utility Records for State Retention <br />2025 <br />0 <br />$0.00 <br />Total Hours <br />0 <br />Check <br />ECI <br />0 <br />0 <br />122 <br />56 <br />0 <br />0 <br />0 <br />0 <br />0 <br />178 <br />$8,466.36 <br />Average Rate(2023) <br />$0.00 <br />$0.00 <br />$49.95 <br />$34.83 <br />$28.32 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />Average Rate (2024) <br />4.7% <br />$0.00 <br />$0.00 <br />$52.30 <br />$36.47 <br />$29.65 <br />$0.00 <br />$0.00 <br />1 $0.00 <br />$0.00 <br />Average Rate (2025) <br />4.7% <br />$0.00 <br />$0.00 <br />$54.76 <br />$38.18 <br />$31.04 <br />$0.00 <br />$0.00 <br />1 $0.00 <br />$0.00 <br />Average Rate(2026) <br />4.7% <br />$0.00 <br />$0.00 <br />$57.33 <br />$39.98 <br />$32.50 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />Total Direct Labor Cost <br />$8,466.86 <br />Overhead @ 185.29% $15,688.25 <br />Labor+ Overhead $24,155.12 <br />Profit @ 9.0% $2,173.96 <br />FCCM @ 0.46% $38.95 <br />Total Labor Costj $26,368.02 <br />DIRECT EXPENSES No. Unit No. Unit Rate <br />Mileage (South Bend to Project Site) <br />Trips x <br />Mi./Trip x <br />$0.49 <br />$0.00 <br />Mileage (Fort Wayne to Project Site) <br />Trips x <br />Mi./Trip x <br />$0.49 <br />$0.00 <br />Lodging <br />Rooms x <br />Nights x <br />$110.00 <br />$0.00 <br />Per Diem <br />Staff x <br />Days x <br />$41.00 <br />$0.00 <br />Printing & Postage <br />$0.00 <br />SUBCONSULTANT FEES <br />Total Direct Expense Cost and Subconsultant Fees $0.00 <br />TOTAL FEE: $26,400.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.