Laserfiche WebLink
CITY OF SOUTH BEND, INDIANA <br />CITY OF SOUTH BEND BOARD OF PUBLIC WORKS <br />ANGELA BOULEVARD IMPROVEMENTS <br />PROJECT NO. 122-059 <br />BIDS OPENING: 10/24/2023 <br />ITEM <br />NO. <br />DESCRIPTION <br />QUANTITY <br />UNIT <br />MILESTONE CONTRACTORS <br />NORTH, INC. <br />RIETH RILEY CONSTRUCTION <br />COMPANY, INC. <br />CONTRACTOR UNIT PRICES <br />ENGINEER'S ESTIMATE <br />UNIT PRICE <br />EXTENSION <br />UNIT PRICE <br />EXTENSION <br />High <br />Low <br />Average <br />UNIT PRICE <br />EXTENSION <br />1 <br />CONSTRUCTION ENGINEERING <br />1 <br />LS <br />$ <br />16,600.00 <br />$ <br />16,600.00 <br />$ 16,000.00 <br />$ <br />16,000.00 <br />$ <br />16,600.00 <br />$ <br />16,000.00 <br />$ <br />16,300.00 <br />$ <br />15,000.00 <br />$ <br />15,000.00 <br />2 <br />MOBILIZATION AND DEMOBILIZATION <br />1 <br />LS <br />$ 116,000.00 <br />$ <br />116,000.00 <br />$ <br />80,000.00 <br />$ <br />80,000.00 <br />$ <br />116,000.00 <br />$ <br />80,000.00 <br />$ <br />98,000.00 <br />$ <br />150,000.00 <br />$ <br />150,000.00 <br />3 <br />CLEARING RIGHT OF WAY <br />1 <br />LS <br />$ <br />30,372.53 <br />$ <br />30,372.53 <br />$ 40,000.00 <br />$ <br />40,000.00 <br />$ <br />40,000.00 <br />$ <br />30,372.53 <br />$ <br />35,186.27 <br />$ <br />40,000.00 <br />$ <br />40,000.00 <br />4 <br />SIDEWALK CONCRETE, REMOVE <br />582 <br />SYS <br />$ <br />29.00 <br />$ <br />16,878.00 <br />$ <br />89.70 <br />$ <br />52,205.40 <br />$ <br />89.70 <br />$ <br />29.00 <br />$ <br />59.35 <br />$ <br />35.00 <br />$ <br />20,370.00 <br />5 <br />EXCAVATION, COMMON <br />2570 <br />CYS <br />$ <br />50.00 <br />$ <br />128,500.00 <br />$ <br />120.15 <br />$ <br />308,785.50 <br />$ <br />120.15 <br />$ <br />50.00 <br />$ <br />85.08 <br />$ <br />60.00 <br />$ <br />154,200.00 <br />6 <br />MILLING, ASPHALT, 1 1/2 IN. <br />21800 <br />SYS <br />$ <br />2.55 <br />$ <br />55,590.00 <br />$ <br />2.75 <br />$ <br />59,950.00 <br />$ <br />2.75 <br />$ <br />2.55 <br />$ <br />2.65 <br />$ <br />3.00 <br />$ <br />65,400.00 <br />7 <br />HMA, SURFACE, TYPE B <br />1812 <br />TON <br />$ <br />146.00 <br />$ <br />264,552.00 <br />$ <br />156.20 <br />$ <br />283,034.40 <br />$ <br />156.20 <br />$ <br />146.00 <br />$ <br />151.10 <br />$ <br />160.00 <br />$ <br />289,920.00 <br />8 <br />HMA, INTERMEDIATE, TYPE B <br />35 <br />TON <br />$ <br />160.00 <br />$ <br />5,600.00 <br />$ <br />392.55 <br />$ <br />13,739.25 <br />$ <br />392.55 <br />$ <br />160.00 <br />$ <br />276.28 <br />$ <br />160.00 <br />$ <br />5,600.00 <br />9 <br />HMA, BASE, TYPE B <br />110 <br />TON <br />$ <br />120.00 <br />$ <br />13,200.00 <br />$ <br />285.70 <br />$ <br />31,427.00 <br />$ <br />285.70 <br />$ <br />120.00 <br />$ <br />202.85 <br />$ <br />140.00 <br />$ <br />15,400.00 <br />10 <br />CURB RAMP, CONCRETE <br />400 <br />SYS <br />$ <br />205.00 <br />$ <br />82,000.00 <br />$ <br />389.35 <br />$ <br />155,740.00 <br />$ <br />389.35 <br />$ <br />205.00 <br />$ <br />297.18 <br />$ <br />210.00 <br />$ <br />84,000.00 <br />11 <br />DETECTABLE WARNING SURFACES <br />55 <br />SYS <br />$ <br />215.00 <br />$ <br />11,825.00 <br />$ <br />229.70 <br />$ <br />12,633.50 <br />$ <br />229.70 <br />$ <br />215.00 <br />$ <br />222.35 <br />$ <br />210.00 <br />$ <br />11,550.00 <br />12 <br />SIDEWALK, CONCRETE, 4 IN. <br />104 <br />SYS <br />$ <br />97.00 <br />$ <br />10,088.00 <br />$ <br />15.80 <br />$ <br />1,643.20 <br />$ <br />97.00 <br />$ <br />15.80 <br />$ <br />56.40 <br />$ <br />110.00 <br />$ <br />11,440.00 <br />13 <br />CURB, REMOVE <br />2074 <br />LFT <br />$ <br />19.00 <br />$ <br />39,406.00 <br />$ <br />25.85 <br />$ <br />53,612.90 <br />$ <br />25.85 <br />$ <br />19.00 <br />$ <br />22.43 <br />$ <br />18.00 <br />$ <br />37,332.00 <br />14 <br />CURB, CONCRETE <br />450 <br />LFT <br />$ <br />90.00 <br />$ <br />40,500.00 <br />$ <br />84.00 <br />$ <br />37,800.00 <br />$ <br />90.00 <br />$ <br />84.00 <br />$ <br />87.00 <br />$ <br />40.00 <br />$ <br />18,000.00 <br />15 <br />CURB AND GUTTER, CONCRETE <br />1630 <br />LFT <br />$ <br />104.00 <br />$ <br />169,520.00 <br />$ <br />87.90 <br />$ <br />143,277.00 <br />$ <br />104.00 <br />$ <br />87.90 <br />$ <br />95.95 <br />$ <br />50.00 <br />$ <br />81,500.00 <br />16 <br />SODDING, NURSERY <br />1950 <br />SYS <br />$ <br />26.30 <br />$ <br />51,285.00 <br />$ <br />47.55 <br />$ <br />92,722.50 <br />$ <br />47.55 <br />$ <br />26.30 <br />$ <br />36.93 <br />$ <br />28.00 <br />$ <br />54,600.00 <br />17 <br />ADJUST VAULT LID TO GRADE <br />1 <br />EACH <br />$ <br />29,660.00 <br />$ <br />29,660.00 <br />$ 15,087.00 <br />$ <br />15,087.00 <br />$ <br />29,660.00 <br />$ <br />15,087.00 <br />$ <br />22,373.50 <br />$ <br />25,000.00 <br />$ <br />25,000.00 <br />18 <br />CASTING, 4, FURNISH AND ADJUST TO GRADE <br />12 <br />EACH <br />$ <br />1,800.00 <br />$ <br />21,600.00 <br />$ <br />1,349.25 <br />$ <br />16,191.00 <br />$ <br />1,800.00 <br />$ <br />1,349.25 <br />$ <br />1,574.63 <br />$ <br />1,200.00 <br />$ <br />14,400.00 <br />19 <br />CASTING, INLET, ADJUST TO GRADE <br />11 <br />EACH <br />$ <br />450.00 <br />$ <br />4,950.00 <br />$ <br />938.10 <br />$ <br />10,319.10 <br />$ <br />938.10 <br />$ <br />450.00 <br />$ <br />694.05 <br />$ <br />900.00 <br />$ <br />9,900.00 <br />20 <br />CASTING, MANHOLE, ADJUST TO GRADE <br />3 <br />EACH <br />$ <br />450.00 <br />$ <br />1,350.00 <br />$ <br />1,101.20 <br />$ <br />3,303.60 <br />$ <br />1,101.20 <br />$ <br />450.00 <br />$ <br />775.60 <br />$ <br />1,000.00 <br />$ <br />3,000.00 <br />21 <br />INLET, B15 <br />5 <br />EACH <br />$ <br />5,840.00 <br />$ <br />29,200.00 <br />$ <br />7,999.90 <br />$ <br />39,999.50 <br />$ <br />7,999.90 <br />$ <br />5,840.00 <br />$ <br />6,919.95 <br />$ <br />6,400.00 <br />$ <br />32,000.00 <br />22 <br />INLET, C15 <br />8 <br />EACH <br />$ <br />6,985.00 <br />$ <br />55,880.00 <br />$ 10,386.75 <br />$ <br />83,094.00 <br />$ <br />10,386.75 <br />$ <br />6,985.00 <br />$ <br />8,685.88 <br />$ <br />7,800.00 <br />$ <br />62,400.00 <br />23 <br />MAINTAINING TRAFFIC <br />1 <br />LS <br />$ <br />62,000.00 <br />$ <br />62,000.00 <br />$ 56,635.00 <br />$ <br />56,635.00 <br />$ <br />62,000.00 <br />$ <br />56,635.00 <br />$ <br />59,317.50 <br />$ <br />50,000.00 <br />$ <br />50,000.00 <br />24 <br />SIGN GROUND MOUNTED RESET <br />20 <br />EACH <br />$ <br />150.00 <br />$ <br />3,000.00 <br />$ <br />250.00 <br />$ <br />5,000.00 <br />$ <br />250.00 <br />$ <br />150.00 <br />$ <br />200.00 <br />$ <br />100.00 <br />$ <br />2,000.00 <br />25 <br />SIGN, SHEET, WITH LEGEND, 0.080 IN. <br />66 <br />SFT <br />$ <br />45.00 <br />$ <br />2,970.00 <br />$ <br />14.00 <br />$ <br />924.00 <br />$ <br />45.00 <br />$ <br />14.00 <br />$ <br />29.50 <br />$ <br />16.00 <br />$ <br />1,056.00 <br />26 <br />SIGN POST, SQUARE, TYPE 1, REINFORCED <br />ANCHOR BASE <br />210 <br />LFT <br />$ <br />23.00 <br />$ <br />4,830.00 <br />$ <br />14.00 <br />$ <br />2,940.00 <br />$ <br />23.00 <br />$ <br />14.00 <br />$ <br />18.50 <br />$ <br />16.00 <br />$ <br />3,360.00 <br />27 <br />TRAFFIC SIGNAL EQUIPMENT, REMOVE <br />3 <br />EACH <br />$ <br />3,200.00 <br />$ <br />9,600.00 <br />$ <br />7,000.00 <br />$ <br />21,000.00 <br />$ <br />7,000.00 <br />$ <br />3,200.00 <br />$ <br />5,100.00 <br />$ <br />7,000.00 <br />$ <br />21,000.00 <br />28 <br />SIGNAL POLE, STEEL STRAIN, 36 FT <br />4 <br />EACH <br />$ <br />14,900.00 <br />$ <br />59,600.00 <br />$ 14,000.00 <br />$ <br />56,000.00 <br />$ <br />14,900.00 <br />$ <br />14,000.00 <br />$ <br />14,450.00 <br />$ <br />15,000.00 <br />$ <br />60,000.00 <br />29 <br />SIGNAL POLE FOUNDATION, 36 IN. X 144 IN. <br />4 <br />EACH <br />$ <br />3,750.00 <br />$ <br />15,000.00 <br />$ <br />4,000.00 <br />$ <br />16,000.00 <br />$ <br />4,000.00 <br />$ <br />3,750.00 <br />$ <br />3,875.00 <br />$ <br />3,500.00 <br />$ <br />14,000.00 <br />30 <br />HANDHOLE, SIGNAL, TYPE 1 <br />5 <br />EACH <br />$ <br />1,600.00 <br />$ <br />8,000.00 <br />$ <br />1,800.00 <br />$ <br />9,000.00 <br />$ <br />1,800.00 <br />$ <br />1,600.00 <br />$ <br />1,700.00 <br />$ <br />1,500.00 <br />$ <br />7,500.00 <br />31 <br />CONDUIT, STEEL, GALVANIZED, 2 IN. <br />498 <br />LFT <br />$ <br />20.00 <br />$ <br />9,960.00 <br />$ <br />40.00 <br />$ <br />19,920.00 <br />$ <br />40.00 <br />$ <br />20.00 <br />$ <br />30.00 <br />$ <br />55.00 <br />$ <br />27,390.00 <br />32 <br />CONTROLLER AND CABINET, TS2 <br />1 <br />EACH <br />$ <br />26,300.00 <br />$ <br />26,300.00 <br />$ 28,000.00 <br />$ <br />28,000.00 <br />$ <br />28,000.00 <br />$ <br />26,300.00 <br />$ <br />27,150.00 <br />$ <br />27,000.00 <br />$ <br />27,000.00 <br />33 <br />CONTROLLER CABINET FOUNDATION, P1 <br />1 <br />EACH <br />$ <br />2,675.00 <br />$ <br />2,675.00 <br />$ <br />1,000.00 <br />$ <br />1,000.00 <br />$ <br />2,675.00 <br />$ <br />1,000.00 <br />$ <br />1,837.50 <br />$ <br />1,000.00 <br />$ <br />1,000.00 <br />34 <br />TRAFFIC SIGNAL HEAD, 3 SECTION, 12 IN. <br />8 <br />EACH <br />$ <br />1,000.00 <br />$ <br />8,000.00 <br />$ <br />1,100.00 <br />$ <br />8,800.00 <br />$ <br />1,100.00 <br />$ <br />1,000.00 <br />$ <br />1,050.00 <br />$ <br />1,000.00 <br />$ <br />8,000.00 <br />35 <br />TRAFFIC SIGNAL HEAD, 4 SECTION, 12 IN. <br />3 <br />EACH <br />$ <br />1,400.00 <br />$ <br />4,200.00 <br />$ <br />1,400.00 <br />$ <br />4,200.00 <br />$ <br />1,400.00 <br />$ <br />1,400.00 <br />$ <br />1,400.00 <br />$ <br />1,000.00 <br />$ <br />3,000.00 <br />36 <br />SIGNAL CABLE, CONTROL, COPPER, 3C/14 <br />UGE <br />4120 <br />LFT <br />$ <br />2.25 <br />$ <br />9,270.00 <br />$ <br />4.00 <br />$ <br />16,480.00 <br />$ <br />4.00 <br />$ <br />2.25 <br />$ <br />3.13 <br />$ <br />4.00 <br />$ <br />16,480.00 <br />NAL CABLE, CONTROL, COPPER, 5C/14 <br />IGAUGE <br />4674 <br />LFT <br />$ <br />2.65 <br />$ <br />12,386.10 <br />$ <br />4.50 <br />$ <br />21,033.00 <br />$ <br />4.50 <br />$ <br />2.65 <br />$ <br />3.58 <br />$ <br />5.00 <br />$ <br />23,370.00 <br />X:\Projects\2022\2261\292850 South Bend Angela\05_Bidding\Bid Tab\Angela Bid Tabulation 10-24-2023 Final Page 3 of 5 <br />