Laserfiche WebLink
<br /> <br />Page 8 <br />(Exhibit A – Engineer’s Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />4. Additional or extended services during construction made necessary by (1) emergencies or <br />acts of God endangering the Work (advance notice not required), (2) the presence at the <br />Site of any Constituent of Concern or items of historical or cultural significance, (3) Work <br />damaged by fire or other cause during construction, (4) a significant amount of defective, <br />neglected, or delayed work by Contractor, (5) acceleration of the progress schedule <br />involving services beyond normal working hours, or (6) default by Contractor. <br />5. Services (other than Basic Services during the Post-Construction Phase) in connection with <br />any partial utilization of any part of the Work by Owner prior to Substantial Completion. <br />6. Evaluating an unreasonable claim or an excessive number of claims submitted by <br />Contractor or others in connection with the Work. <br />7. Services during the Construction Phase rendered outside of A1.06 <br />8. Reviewing a Shop Drawing more than three times, as a result of repeated inadequate <br />submissions by Contractor. <br />9. While at the Site, compliance by Engineer and its staff with those terms of Owner's or <br />Contractor's safety program provided to Engineer subsequent to the Effective Date that <br />exceed those normally required of engineering personnel by federal, state, or local safety <br />authorities for similar construction sites.