Laserfiche WebLink
<br /> <br />Page 7 <br />(Exhibit A – Engineer’s Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />17. Providing assistance in responding to the presence of any Constituent of Concern at the <br />Site, in compliance with current Laws and Regulations. <br />18. Preparing Record Drawings showing appropriate record information based on Project <br />annotated record documents received from Contractor and furnishing such Record <br />Drawings to Owner. <br />19. Preparation of operation and maintenance manuals. <br />20. Preparing to serve or serving as a consultant or witness for Owner in any litigation, <br />arbitration, or other dispute resolution process related to the Project. <br />21. Providing more extensive services required to enable Engineer to issue notices or <br />certifications requested by Owner. <br />22. Assistance in connection with the adjusting of Project equipment and systems. <br />23. Assistance to Owner in training Owner’s staff to operate and maintain Project equipment <br />and systems. <br />24. Assistance to Owner in developing procedures for (a) control of the operation and <br />maintenance of Project equipment and systems, and (b) related record-keeping. <br />25. Overtime work requiring higher than regular rates. <br />25. Other services performed or furnished by Engineer not otherwise provided for in this <br />Agreement. <br />A2.02 Additional Services Not Requiring Owner’s Written Authorization <br />A. Engineer shall advise Owner in advance that Engineer is will immediately commence to perform <br />or furnish the Additional Services of the types listed below. For such Additional Services, <br />Engineer need not request or obtain specific advance written authorization from Owner. Engineer <br />shall cease performing or furnishing such Additional Services upon receipt of written notice from <br />Owner. <br />1. Services in connection with work change directives and change orders to reflect changes <br />requested by Owner. <br />2. Services in making revisions to Drawings and Specifications occasioned by the acceptance <br />of substitute materials or equipment other than “or-equal” items; services after the award of <br />the Construction Contract in evaluating and determining the acceptability of a proposed "or <br />equal" or substitution which is found to be inappropriate for the Project; evaluation and <br />determination of an excessive number of proposed "or equals" or substitutions, whether <br />proposed before or after award of the Construction Contract. <br />3. Services resulting from significant delays, changes, or price increases occurring as a direct <br />or indirect result of materials, equipment, or energy shortages.