My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - PE-Mishawaka Streetscape Proj No. 121-072 - A&Z Engineering LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
PSA - PE-Mishawaka Streetscape Proj No. 121-072 - A&Z Engineering LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2023 2:23:18 PM
Creation date
11/14/2023 2:23:01 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
11/14/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />Page 2 <br />(Exhibit A – Engineer’s Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />4. Based on the information contained in the Preliminary Design Phase documents, prepare a <br />revised opinion of probable Construction Cost, and assist Owner in collating the various <br />cost categories which comprise Total Project Costs. <br />5. Perform or provide the following additional 30% Preliminary Design Phase tasks or <br />deliverable such as Utility Coordination. <br />6. Furnish 2 review copies of the Preliminary Design Phase documents and any other <br />deliverables to Owner within 30 calendar days of authorization to proceed with this <br />phase and review them with Owner. Within 10 calendar days of receipt, Owner shall <br />submit to Engineer any comments regarding the Preliminary Design Phase documents and <br />any other deliverables. <br />7. Revise the 30% Preliminary Design Phase documents and any other deliverables in <br />response to Owner’s comments, as appropriate, and furnish to Owner 2 copies of the <br />revised 30% Preliminary Design Phase documents, revised opinion of probable <br />Construction Cost, and any other deliverables within 7 calendar days after receipt of <br />Owner’s comments. <br />B. Engineer’s services under the 30% Preliminary Design Phase will be considered complete on the <br />date when the revised 30% Preliminary Design Phase documents, revised opinion of probable <br />Construction Cost, and any other deliverables have been delivered to Owner. <br />A1.03 60% Preliminary Design Plans <br />A. After acceptance by Owner of the 30% Preliminary Plans, Engineer shall: <br />1. Perform or provide the following 60% Preliminary Design Phase tasks or deliverables: <br />a. Demolition Plans <br />b. Intersection Grading Plans <br />c. Finalize Drainage in Plan and Profile Plans <br />d. Finalize Watermain Replacement Plans <br />e. Finalize Pavement Marking and Signage Plans <br />f. Traffic Signal Plan <br />g. Lighting Plan <br />h. Street furniture, tree planting plan <br />i. Erosion control Plan <br />j. Tables for Pavement, Structure, Sign/Post <br />k. Details Sheets <br />l. Cross-Sections <br />m. Coordinate with Utilities regarding conflicts, their resolution and request Work Plans <br />and Schedule <br /> <br />2. Advise Owner if additional reports, data, information, or services of the types described in <br />Exhibit B are necessary and assist Owner in obtaining such reports, data, information, or <br />services.
The URL can be used to link to this page
Your browser does not support the video tag.