My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - PE-Mishawaka Streetscape Proj No. 121-072 - A&Z Engineering LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
PSA - PE-Mishawaka Streetscape Proj No. 121-072 - A&Z Engineering LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2023 2:23:18 PM
Creation date
11/14/2023 2:23:01 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
11/14/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />Page 1 <br />(Exhibit A – Engineer’s Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />This is EXHIBIT A, consisting of pages, referred to <br />in and part of the Agreement between Owner and <br />Engineer for Professional Services dated , . <br />Engineer’s Services <br /> <br />Article 1 of the Agreement is supplemented to include the following agreement of the parties. <br /> <br />Engineer shall provide Basic and Additional Services as set forth below. <br /> <br />PART 1 – BASIC SERVICES <br />A1.01 Schematic Plans <br />A. Engineer shall: <br />1. Prepare schematic drawings showing cross-section, pavement reduction, lane <br />configuration, parking, protected bike lanes and pavers and streetscape. <br />2. Prepare preliminary cost estimate. <br />3. Meet with City staff to discuss and incorporate reviews. <br />4. Revise cost estimate in accordance with the reviews. <br />5. Furnish 2 review copies of the revised Schematic plans and cost estimate. Within 7 <br />calendar days of receipt, Owner shall comment on or approve the Schematic plans. <br />Approval or Absence of Owner’s comments shall be deemed as completion of Schematic <br />Plan Phase and approval to proceed with the next Phase of the Project <br />A1.02 30% Preliminary Design Plans <br />A. After acceptance by Owner of the Schematic Plan, Engineer shall: <br />1. Undertake four (4) Pavement cores and four (4) Soil Borings <br />2. Perform or provide the following 30% Preliminary Design Phase tasks or deliverables: <br />a. Typical Cross-Sections <br />b. Maintenance of Traffic Schemes <br />c. Plan and Profile Sheets <br />d. Preliminary Drainage design <br />e. Watermain Replacement Plans <br />f. Pavement Marking and Signage Plans <br />g. Coordinate with Utilities to confirm location of their facilities. <br /> <br />3. Advise Owner if additional reports, data, information, or services of the types described in <br />Exhibit B are necessary and assist Owner in obtaining such reports, data, information, or <br />services.
The URL can be used to link to this page
Your browser does not support the video tag.