Amendment No 3 to PSA - Seitz Park Wall Proj No. 121-079 – American Structurepoint, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No 3 to PSA - Seitz Park Wall Proj No. 121-079 – American Structurepoint, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2023 2:21:20 PM
Creation date
11/14/2023 2:21:14 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
11/14/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Ms. Kara Boyles <br />October 17, 2023 <br />Page 2 <br />2021.02999 <br /> Attended progress meetings for the Seitz Park projectMeetings with the City of South Bend, Lochmueller <br />Group, and Ziolkowski Construction to discuss project construction cost estimate from Ziolkowski <br />Construction <br /> Value engineering to reduce the cost of the project. Revision 1 and 2 of the plans and specifications <br />because of the value engineering <br /> Meeting with Ziolkowski Construction and Lochmueller Group to update the joint repairs <br /> Responded to Ziolkowski’s questions during bidding and through the beginning of construction <br /> Site visits to inspect the backside of the abutment wall <br /> Weekly construction progress reports to the Federal Energy Regulatory Commission (FERC) <br /> Shop Drawing Reviews <br />The scope of services proposed include: <br /> Attend two (2) additional progress meetings with the City of South Bend, Lochmueller Group, and the <br />Contractor during construction <br /> Respond to contractor questions during construction <br /> Three (3) site visits to inspect the condition of the existing wall during construction <br />o Identify the appropriate joint/crack repair method for each joint/crack <br /> Review the stability analysis calculations if the profile of the wall is different than assumed during design <br /> Weekly progress reports to the FERC <br /> Final construction report for the FERC <br />The proposed scope of services does not include: <br /> Redesign of wall stability <br /> Non-destructive testing (NDT) <br /> Obtaining new waterway permits <br /> Construction Inspection <br /> Creation of documents for the FERC other than those specifically identified in amendment #2 <br /> Survey <br /> Geotechnical Engineering <br /> <br /> <br /> <br />DocuSign Envelope ID: 04B69E2E-25A4-4B92-9F70-91C69F1F59D3
The URL can be used to link to this page
Your browser does not support the video tag.