My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 3 to PSA - Seitz Park Wall Proj No. 121-079 – American Structurepoint, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No 3 to PSA - Seitz Park Wall Proj No. 121-079 – American Structurepoint, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2023 2:21:20 PM
Creation date
11/14/2023 2:21:14 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
11/14/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />2021.02999 <br />October 17, 2023 <br />Ms. Kara Boyles, Ph.D., PE <br />City Engineer <br />City of South Bend <br />227 West Jefferson Boulevard, Ste. 1316 <br />South Bend, IN 46601 <br /> <br />RE: Seitz Park Retaining Wall <br />Project No. 121-079 <br />Amendment #3 <br /> <br />Dear Ms. Boyles, <br />For your consideration, American Structurepoint, Inc. is requesting supplemental fee for additional <br />services to be performed under our agreement for the referenced project. Enclosed is a man-hour <br />justification for the additional items for your review. Our proposed maximum not-to-exceed supplemental <br />fee request is $48,900. <br />American Structurepoint is designing a rehabilitation for the South Bend Dam East Abutment. The scope <br />of work for the rehabilitation design was outlined in Amendment #2. Out of scope work has occurred to <br />keep the project moving without delay. The project will require additional scope of services to complete <br />per the current rehabilitation plans and specifications. <br />Professional Engineering Services <br />Out of Scope Work to Date <br /> We were instructed to create the deliverable documents to be advertised for bid. These documents <br />then were changed to be an amendment to the Seitz Park project. <br /> The specifications were prepared as a separate document and not on the plans. The specifications <br />were modified to be compatible with the Seitz Park project. <br /> Cost estimates were prepared for preliminary plans and final plans. <br />DocuSign Envelope ID: 04B69E2E-25A4-4B92-9F70-91C69F1F59D3
The URL can be used to link to this page
Your browser does not support the video tag.