Laserfiche WebLink
I. The ENGINEER shall provide the following Deliverables to the OWNER: <br />1. Final right of way parcel files for OWNER records. <br />2. Original recorded documents. <br />J. The ENGINEER shall attend such conferences with the OWNER and other <br />interested parties and /or agencies, as may be required, in connection with this <br />work. <br />K. Services resulting from significant changes in the general scope, extent or <br />character of the Project or its design including, but not limited to, changes in size, <br />complexity, OWNER's schedule, character of construction or method of <br />financing; and revising previously accepted studies, reports, design documents <br />or Contract Documents when such revisions are required by changes in laws, <br />rules, regulations, ordinances, codes or orders enacted subsequent to the <br />preparation of such studies, reports, or documents, or are due to any other <br />causes beyond the ENGINEER's control, shall require a change in work as <br />provided by Section VI - General Provisions, Paragraph 12 titled "Changes in <br />Work ". <br />Fellows Street Right of Way Acquisition Services APPENDIX "A" <br />March 2013 <br />Page 4 of 4 <br />