Laserfiche WebLink
In <br />GARMONG <br />Garmong Construction - Fart Wayne Office <br />Printed on Fri Oct 13, 2023 at 08:03 am EDT <br />jab #: 6968 MILK Dream Center <br />1522 Linden AVenVe <br />South Bend, Indiana 45625 <br />Y Subject Status Responalble Rocelvad From A"Niu a Date lnftU tad RF! Due Data Closed Daly Ball In Court Location 5chadule Lost Los! <br />Contractor Manapr Impact Code Impact <br />Please clarify the discrepancy between 223100, 2-2A Domestic Water Softeners and PDA Plumbing Equipment Schedule requirements for the water softener mineral tank construction. The Specification requires fabricated <br />carbon skeet and the equipment 5chedule indicates FRP, <br />A: Virgil Dea es (Meticulous Design•Architectute. LLG Responded Tue Sep 22, 2023 at 04:55 pm EDT <br />Mineral tank const—tion to be FRP. <br />PC-061 Missing Specifi[ation 236200 Closed None Deanes, 09111RD23 Rochelle 09/12/2023 09113/23 <br />Virgil{M... Gardner <br />Rochelle Gardner Senn Mon Sep 11, 2023 at 06:13 pm EDT <br />Q' The technical specifications is missing specilkation section 236200 Packaged Compression and Condenser unis. Please include in Addendum 93 if applicable, <br />Virgil Deanes (Meticulous Design -Architecture, LLQ Responded Tve Sep 12, 2023 at 04:40 pm EDT <br />A: Spec Section 236200 Packaged Compression and Condenser units has been deleted per Addendum u1 - REv 1- Aug. 28. 2023- <br />"There are no walk-in coolers in the kitchen spaces so there would be n0 information related to condensers and: compressors.n <br />PC-060 Domestic V1&W Pipe Fittings Closed pone Deanes, 09111f2023 Rochelle 09/1212023 09113/23 <br />Virgil(M... Gardner <br />Rochelle Gardner Sent Mort Sep 11. 2023 at 07:56 pm EDT <br />Q' Are mechanically formed tee'5 acceptable? Cr-Dolls) <br />Virgil Deanes (Meticulous Design -Architecture, LLC) Responded Tut Sep 12, 2023 at 04:54 pm EDT <br />Mechanically formed tee's are acceptable. <br />Spec Section 221116 Domestic water Piping will be updated in Addendum 03 to include: <br />A: -H, Copper•Tube, Mechanically Formed Tee Fitting • Domestic water. Far forrcung T•branch on copper water tube <br />• DeSuiption: Tee Formed in copitertvbe in accordance with ASTM F2014," <br />PC-059 BIM Requirements Closed None Deaai {I s, 09111/2023 1%,Whelle 09/22/2023 09/13123 <br />VirgM <br />Rochelle Gardner Sent Mon Sep 11, 2023 at e7129 pm ECT <br />Qi Specification section 019313. 3-05-C references "Contractor shall submit a Fully as -built Project Retard Revit model for review at time of final completion, It is desired by the Owner to integrate Revit model into the Owner's internal <br />CMM5 System- see 01 35 13 Calm VDC Requi rementsi For details." There is nil Section 013513 DIM VDC Requirements. Please confirm whether or not DIM VDC is a requirement - <br />Virgil Deanes (Meticulous oesign-Architecture, u-C) Responded Tuee Sep 12, 2023 at 0439 pm EDT <br />A' There are no BIM VDC requirements. The note "5ee 023513 "BIM VDC Requirements" For Beta its" will be removed from Spec Section 019313 General CommiSSioning Reoviferrien15. 3,05-C per Adderldurn k3. <br />PC-058 Exlsbng OAS Closed None DeeaneSS, 09111f2023 Roche M1212023 D9113f23 <br />Q: Rerhebe Gardner Sant Men Sep 11, 2021 at 07:21 pm EDT <br />The Drawings make reference to the eeiMi nq SA5. Please Clarify in Addendum N3 there IS no existing OAS. <br />A: Virgil Deanes (Meticutous Design-ArchlGec tore. LLG Responded Tee Sep 12. 2023 at 04:49 pm EDT <br />There is no existing BAS- <br />PC-057 Polished Concrete Closed Wane Deanes, 09/110023 Roches! 09/1212023 09118123 <br />Reche%e Gardner Sent Mon Sep 11,21023 at 05A10 pm EDT <br />Q There is no specification for polished concrete indicating desired finish and revel of polish, This questions was asked pnrnously and not answered. We know there is no polished rncocreter on the site, however there is polished <br />Page 8 of 2.2 <br />