My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment to MLK Dream Center GMP - Finalize GMP – C.H. Garmong & Sons, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
Amendment to MLK Dream Center GMP - Finalize GMP – C.H. Garmong & Sons, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 8:53:14 AM
Creation date
10/24/2023 1:28:19 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/24/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
In <br />GARMONG <br />Garmong Construction - Fart Wayne Office <br />Printed on Fri Oct 13, 2023 at 08:03 am EDT <br />job #: 6968 MILK Dream Center <br />1522 Linden Avenue <br />South Bend, Indiana 4662$ <br />Y Subject Status Responelble Received From A"Wnee Date lnftU tad RFf Due Date Closed Data Ball In Court Location Schedule Lost Cost <br />Contractor Manager Imact Code Impact <br />Rochelle Gardner Sent Tut Sep 12, 202.1 at Oil! 28 pm EDT <br />Q: Dream Room 103 ceiling on Drawing A-151 is noted as "exposed structure above painted P-1'. The ceiling noted for this space on Drawing 1-401 is noted as "metal panel cloud". P ease verify the ceiling finish in Dream Roam W3. <br />It the desired ceiling includes metal clouds, please provide a cloud layout and details- <br />A!Virgil Deanes [Meticulous Design-Architectum, LLC) Responded Fri Sep 15, 2023 at 02A4 pre EDT <br />Sheet 1-401 has been updated to indicate that the Dream Room 103 ceiling type is Exposed to the Structure Move in lieu of Metal Pan Cloud, per Addendum #3 REY 3• Sept. 13, 2023. <br />PC-066 MpC-3 <br />Closed Hone DD'Yge s. 09/1212023 ���e 09/13/2023 091IW23 <br />Rochelle Gardner Sent Toe Sep 12, 2023 at Oil: 24 pm EDT <br />0: MPC-3 is noted as the ceil ing type in the YogalDance morn, however Drawing A•152 indicates this room has an exposed painted structure above P•1, which wntradicts the Enlarged YogalDance Ceiling flan (Drawing 1.404) <br />indicating metal pan ceiling. Please clarify whether or not this area receives 14PC3 or painted exposed structure. <br />Virgil Deanes (Meticulous Design -Architecture, LLC) Responder! Fri Sep 15, 2023 at 02:43 pm EDT <br />A: Sheet 1.701 has been updated to indicate that MPC-3 be removed from the schedule, per Addendum lea REV 3- Sept. 13. 2023. <br />Sheet 1.404 has been updated to indicate that the Yogaloance Room 201 ceiling type is Exposed to the Structure Above in lieu of Metal Pan Ceiling, per Addendum #3 REV 3- SW. 13. 2023. <br />PC-065 MP(-2 <br />Closed None Deanes, o911212023 Rochelle 0%A212023 09113/23 <br />Virgii[M... Gardner <br />Rochelle Gardner Sent Tue Sep 12, 2023 at 01:22 pro EDT <br />Q: MPC-2 is noted as the cell ing type in the Fitness Center, however Drawing A-152 indicates this roan has an exp ased painted structure above P-1, which contradicts the Enlarged Fitness Center Ceiling Plan (Drawing 1404) <br />indicating metal pan ceiling- Please Clarify whether or not this area receives MPC-2 or painted exposed 5trumm- <br />A: vlrgil Deanes (Meticulous lo-ign•Architec tore, LLC) Responded Sim: Sep 12, 2023 at 05;18 pm EDT <br />The Fitness Center has an exposed painted structure above. The Enlarged Rtness Center Ceiling Plan (Drawing 1-404) wi 11 be updated in Addendum 93. <br />PGe64 MPC'l location Closed plane Deanes, 0911212023 Rochelle 0911W2023 09118123 <br />virgiI[M... Gardner <br />Rochelle Gardner Sent Tue Sep 12. 2023 at 01:05 pm EDT <br />0: MPC-2 & MPC-3 are noted in Fitness Center & Yoga]C ante Studios respectively, however. MpC-1 has not been designated for any specific location nor is it indicated onthe Reflected Ceiling Plans A-151 orA-152. Which norms <br />receive M PC• 17 <br />Virgil peones IMeti[utouS Design-ArChi*Chft. LLC) Responded Fri Sep 15. 2023 at o2:43 pre: EDT <br />A: Sheet 1.701 has been updated to indicate that MPC-1, MPC.2 & MPC•3 be removed fmm the schedule, per Addendum #3 REV 3- Sept. 13, 2023. The Fitness Center & YogalDance Studios ceiling types are to be Exposed to the <br />Structure Above in lieu of the Metal Pan Cei li 1gs- <br />PC•063 utility Meters Closed None V�i„ s' OW120023 ���e 09/13/2023 09113f23 <br />Rochelle Gardner Sentiue Sep 12, 2023 at 1.2;54 pm EDT <br />Q: Drawing P4.1, General Notes B and C indicate the Contractor is responsible for installation the natural gas and dornestic water meters. These are typically utllity service provider Installations; please verify who is responsible for <br />service installation up to and including the meter - <br />Virgil Deans (Meticulous Design -Architecture, LLC) Responded Too Sep 12, 2023 at 04:56 pm EDT <br />A: Contracmr to coordinate with utility to ensure meters that meet r.4.i—ms. listed an drawings are installed. As notes state, if utility provided meter cannot provide capability indicated, Contractor mvstsupply svbmetee.. <br />Contractor to also review other heynotef for additional submeteriog locations indicated on the plans that are required for LEER purpose5- <br />PC-062 Water Softener Tank, Can,truction Closed Hone Deans' Rochelle <br />0911212023 Gardner 091I312023 09113r23 <br />Yrgii[M... <br />0: Rochelle Gardner Sent Tue Sep 12, 2023 at 22:40 pro EDT <br />Page 7 of 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.