Laserfiche WebLink
In <br />GARMONG <br />Garmong Construction - Fart Wayne Office <br />Printed on Fri Oct 13, 2023 at 08:03 am EDT <br />Job #: 6968 MILK Dream Center <br />1522 Linden AvenVe <br />South Bend, Indiana 4652$ <br />Y subject status Responsible Rocelvad From Assdynee Date InftU tad RFJ Due Date Closed Data Ball In court Location Sdnedulo Cost Cost <br />Contractor Manager lie"ot Code Impact <br />There is no specification for the lockers. Please issue a sperification for this equipment. <br />A. Virgil peones (Meticulous DeSign•Architectuie, LLG Responded Fa Sep 15. 2023 at 04;10 Jim EDT <br />Spec Section pertaining to the Lockers will be provided in Addendum N4. <br />PG092 Ninfawarrior Course Specifleation"awings Closed Nd V�i SI , 09I14M23 GRardnee o911512023 09IM23 <br />Q: Rochelle GardnerSerlt-rhu Sep 14.2023 at 08:41 pm EDT <br />There is not information on the Ninia WannorCourse either in the ProiMliechnical Specifications or Drawings. Please provide this Information. <br />AI Virgil Deanes?Meticulous Design -Architecture, LLCJ Responded Fri: Sep 15, 2023 at 04:07 pm FDT <br />Challenge course equipment is specified in 11f9M. Ray Field Equipment and Structures, Item 2.3. A.I. Atorrection to Item 2.1, 8, 2, will be issued in Addendum 4 folder, <br />PC-091 Natural Gas Pressure Closed None Vlez nfM 09113f2023 NochGard�! 09/14/2023 09/18/23 <br />Rochelle Gardner Sent Wed Sep 13, 2023 at 08:01 pm EDT <br />R' The Bid Documents do not indicate the incarning natural gas pressure provided by the utility company nor will util lty Companies commun lcate this information to contractors. Please clarify incoming natural gas pressure. <br />Al Virgil Deanes [Meticulous beslgn•Architec tune, u-C) Responded Fri Sep 15, 2023 at 03:02 pm EDT <br />Refer to sheet P2.1 at the gas server entrance. Drawl ngs indicate 2 PSI inlet pressure after meter. This Is also Irdleated on sheet P3A. <br />p(--og0 5tomn System Test Requiremerm Closed None ZanC John o9113R023 Rochelle 09114/�0Z3 09114/23 <br />iVSEn... Gardner <br />Q: Rochelle Gardner Sent Wed Sep 13.2023 at 07:59 pm EDT <br />Will leakage testing of the storm sewer and manholes be required? <br />A: John tarn. ivy Engineering} Responded Thu Sep 14. 2023 at 03:37 pm EDT <br />Testing and acceptance of all storm sewers shall meet the City of South Bend Standards, current edition. <br />PC-009 New Water Line Valves Closed None Iamjohn 09/1312023 Rochelle 09/1412023 09114123 <br />(VS En... Gardner <br />Q: RocheHe Gartner Sam Wed Sep 13, 2023 at 07:58 pm EDT <br />It does not appear that the documents require new main line water valves on the new water main. Will valves be required? <br />Al John Zant (V5 Engineeringl Responded Thu 5ep 14, 2023 at 03,40 pm EDT <br />The City has not asked for new valves in this section of new water main- <br />PC-06B Water Shut Down Closed stone ZanC John 09113RO23 Rachel le M1412023 09/14/23 <br />(VS En.-- Gardner <br />Rochelle Gardner Sent Wed Sep 13, 2023 at 07:55 pm EDT <br />What is the expectation for shutting down the water main for connection at the intersection of College & Birdse I? Are there existing valves or will line stops be required? <br />R� <br />Will this fine he required to remain active? <br />AI John lard. (VS Engineering) Responded Thu Sep 14, 2023 at 03:51 pm EDT <br />The expectation is to coordinate with the Ioc at residents, and the City of South Bend so that the switchover distvrbance can he kept to a ntinimum- <br />PC-087 RII Existing Scheduled For Removal Closed Norte Zant,John 09/13/2023 Rochelle 09/1412023 09114M <br />{VS En... Gardner <br />Page 2 of 22 <br />