Laserfiche WebLink
In <br />GARMONG <br />Garmong Construction - Fart Wayne Office <br />Printed on Fri Oct 13, 2023 at 08:03 am EDT <br />Jab #: 6968 MILK Dream Center <br />1522 Linden Avenve <br />South Bend, Indiana 4652$ <br />RFf LOG <br />4 Subject Status Responsible Received From Assignee Date Initiated RH Due Data Closed Date Bali In court Location schedule Cost Cost <br />Contractor Manager Impact Cade Impact <br />PC-o% Roofing Questions! Scope Clarifications Closed None Springer. 0911912023 ri092212Q23 09120na Spnger <br />Josh Springer Sent Tue Sep 19, 2023 at 04:01 pm EDT <br />Pled5e LWrifyMe plywWdAo50lotion on page 002413.1 of the project manual in 0R N 7.15 this package responsible for the vertical plywood and in5ulatipfl at the inKnor walls of the pa rapers? IF you reference detail 31 <br />A504 each side of the wall shows insulation and plywood. Are we only responsible for the insulatiMIRI ywood that's directly behind our membrane? Behind the metal panels? Both? <br />Q: Are we only responsible for the -horizontal rigid insulation in the roofing field? <br />Can you clariFy that wood *Cking in its entirety is exCluded from BP 477 <br />• Can you clarify the overall minimum insulation thl(;knes5 at the fully tapered roof Sections? Roof assemblies R21R3 on drawing sheer A•001 do not Clearly show it - <br />Do we make out the bid bond to the City of South Send or Garmong Construction Services? <br />Josh Springer (Garmong Construction Services - Fort Wayne} Responded Wed 5ep D. 2023 at 09:47 am EDT <br />A: After further renew, item al in the previous response is being revised. The plywood on the -interior side- of the parapet will be by the General Trades contractor and NOT by the nofing contractor. Roofing will still be responsible <br />for the rigid insulation behind their membrane on the parapets. Roofing should include any plywood for millers 'or flashing or termination bars. Roofing should also include all battinsulation at roofing expansion jolrR& <br />Josh Springer (Garmung Construction Services • Fort Wayne) Responded Tue Sep 19, 2023 at 04:19 pm EDT <br />1. This Bid Package is responsible for the plywood and insulation at the parapets on the -interior side". to. are only responsible for the plywood and insulation that are behind your membrane. The i nsulation/plywood behind metal <br />panels Is by another Bid Category <br />A; 2. You are responsible For the horizontal rigid insulation in the roofing field- <br />3. The only blockmWbacking required by this tad package is for plywood backing over rigid insulation at termination and expansion joints. <br />4. Insulation thickness was previously answered in RN PC-080. <br />S. Bid Band is to Garmung. <br />PC-095 �ureFplex Polycrete SL8 vs Dur•a-Flex MOB Closed Weaver, Kelly Dency aain s'... 09119f2023 joshSpriger OW22,0023 09119f23 <br />Josh Springer Sent Tue Sep 19, 2023 at 02:45 pm EDT <br />Q; In addendum i13 the finish legend is spellingout Dur-a-Flex Pplycmte SLB with Charcoal TF topcoat and the plan specification manual is calling for Dur-a-Fier MOB wl QRok & Novelac topcoat. This is quite the difference! One <br />option is 118" thick, the other is 1W. Could ycu please find out which one is correct for the Fluid applied flooring? <br />A; Virgil Deans (Meticulous Design -Architecture, u-C) Responded Tue 5ep 19, 2023 at 03:38 pm EDT <br />The correct finish for Me fluid applied flootiio 7 is Dur-a-F Iex MDB wl QRok & Novolac topcoat. The Finish Legend will be updated in Adderclum Nil, <br />PC-094 Qve0ons about 1-702 and Ceilings Closed Gibson-Lewls, PaIfner. Brian (Gjbspn-Lewis. LLQ D@&ms' 09/1912023 josh 09f2212023 09119/23 <br />LLC VirgiI(M... Springer <br />josh Springer Sent Tue Sep 19. 2023 at 09:4fi am EDT <br />I do not see product numbers listed on 1.701 from Adden#!l Revised. There are multiple [Iles that meet the the general dsc eriptions listed. Did APG3 get ellminated7 It is nw..listed on 1.701 from Addendum R3 Revised. Old <br />Q' Spec 095421 - Metal dum Pan Ceilings gat eliminated from the pmject completely? This telling type is noted in some of the rooms on the Room Finish Sc hedute on I-fO3 as reissued in Addendum 03 Revised. but it appears that it was <br />eliminated on the revised I Drawings from Addendum #3 Revised. <br />Virgil beans (Meticulous Design -Architecture, LLG Responded Tue Sep 19, 2023 at 03:53 pm EDT <br />A: ACP-3 is not In the Finish Legend on Sheet I401 - there are no areas that require Humidity Resistant Acoustical panel Ceilings in this project. <br />Specification Section 095421 - Metal Pan Ceilings has been deleted per Addendum!#3 - REV S. Sept. 13, 2023. There are no Metal Pan Ceilings in this project Sheet I-1021 Room Knish Schedule will be updated in Addendum a4. <br />PG093 Locker Specification Closed None V�irtes, OW14/2023 Pmh@HGartrHe 09/15/2023 09118(23 <br />Q; Rochelle Gardner Sent Thu Sep 14, 2023 at CB:42 pm EDT <br />Page . OF 22 <br />