My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment to MLK Dream Center GMP - Finalize GMP – C.H. Garmong & Sons, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
Amendment to MLK Dream Center GMP - Finalize GMP – C.H. Garmong & Sons, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 8:53:14 AM
Creation date
10/24/2023 1:28:19 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/24/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The pergola is indicated as pressure -treated 2x12 framing which may be unattractive, we have added <br />$4,200 for cedar framing in lieu of pressure -treated wood. <br />■ The display cases are priced as custom units in lieu of the specified manufactured units. <br />Division 07 —Thermal & Moisture Protection: <br />• We have included aluminum painted soffit on the outbuildings, perforated for ventilation as required. <br />• We have included 24" x 24" pavers on Balcony of Brotherhood; the manufacturer does not offer 20" x <br />20" pavers. <br />• We include snow guards over openings on the outbuildings only. <br />Division 09 — Finishes: <br />• We have included an Allowance of $6,500 for custom vinyl wallcovering. <br />• We have included an Allowance of $15,000 for interior vinyl wall graphics. <br />■ We have excluded metal ceiling panels and grid. <br />• We exclude walk -off mats in gym at the exterior doors, we have included industrial rugs for these <br />openings. <br />■ We have included CPT-1 in Music/Video Studio 109. The Documents indicate both carpet and polished <br />concrete. <br />• We have included an Allowance of $30,000 for curtainwall graphics. <br />• We have included an Allowance of $15,000 for timeline graphics. <br />Division 10 — Specialties: <br />• We have included an Allowance of $15,000 for interior signage and lettering. <br />• We have included an Allowance of $7,000 for exterior wayfinding signage. <br />■ We have included as Allowance of $20,000 for Linden Avenue Streetscape signage. <br />Division 11— Equipment: <br />■ All sports equipment [basketball hoops, volleyball systems, wall padding, etc.] will be manufactured by <br />Performance Sports Systems. <br />Division 12 — Furnish <br />We exclude all furniture, fitness equipment, television monitors, monitor mounts, and artwork. <br />Division 21— Fire Protection: <br />• We exclude the cost of a booster pump. <br />Division 22 — Plumbing <br />• Showers in Family Restrooms 113 and 113A are prefabricated units. These showers are updated model <br />Gelcoat Module Aquatic 1363BFSD in lieu of the specified model; the specified model is no longer ADA <br />compliant. The matching Moen valve is included in lieu of the specified Leonard model. <br />• The specified L-2 faucet is discontinued; we included American Standard <br />A70213205002 faucet. I h <br />GQRMONG <br />October 17, 2023 MLK DREAM CENTER & LINDEN AVE STREETSCAPE <br />CLARIFICATIONS AND ASSUMPTIONS <br />2of3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.