Laserfiche WebLink
<br /> <br />Page 3 <br />(Exhibit A – Engineer’s Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />7. Revise the Preliminary Design Phase documents and any other deliverables in response to <br />Owner’s comments, as appropriate, and furnish to Owner copies of the revised <br />Preliminary Design Phase documents, revised opinion of probable Construction Cost, and <br />any other deliverables within calendar days after receipt of Owner’s comments. <br />B. Engineer’s services under the Preliminary Design Phase will be considered complete on the date <br />when the revised Preliminary Design Phase documents, revised opinion of probable Construction <br />Cost, and any other deliverables have been delivered to Owner. <br />A1.03 Final Design Phase <br />A. After acceptance by Owner of the Preliminary Design Phase documents, revised opinion of probable <br />Construction Cost as determined in the Preliminary Design Phase, and any other deliverables subject <br />to any Owner-directed modifications or changes in the scope, extent, character, or design <br />requirements of or for the Project, and upon written authorization from Owner, Engineer shall: <br />1. Prepare final Drawings and Specifications indicating the scope, extent, and character of the <br />Work to be performed and furnished by Contractor. <br />2. Provide technical criteria, written descriptions, and design data for Owner’s use in filing <br />applications for permits from or approvals of governmental authorities having jurisdiction to <br />review or approve the final design of the Project; assist Owner in consultations with such <br />authorities; and revise the Drawings and Specifications in response to directives from such <br />authorities. <br />3. Advise Owner of any adjustments to the opinion of probable Construction Cost known to <br />Engineer. <br />4. Perform or provide the following additional Final Design Phase tasks or deliverables: [here <br />list any such tasks or deliverables] <br />5. Prepare and furnish bidding documents for review by Owner, its legal counsel, and other <br />advisors, and assist Owner in the preparation of other related documents. Within days <br />of receipt, Owner shall submit to Engineer any comments and, subject to the provisions of <br />Paragraph 6.01.G, instructions for revisions. <br />6. Revise the bidding documents in accordance with comments and instructions from the <br />Owner, as appropriate, and submit final copies of the bidding documents, a revised <br />opinion of probable Construction Cost, and any other deliverables to Owner <br />within calendar days after receipt of Owner’s comments and instructions. <br />B. Engineer’s services under the Final Design Phase will be considered complete on the date when the <br />submittals required by Paragraph A1.03.A.6 have been delivered to Owner. <br />C. In the event that the Work designed or specified by Engineer is to be performed or furnished under <br />more than one prime contract, or if Engineer’s services are to be separately sequenced with the work <br />of one or more prime Contractors (such as in the case of fast-tracking), Owner and Engineer shall, <br />prior to commencement of the Final Design Phase, develop a schedule for performance of Engineer’s