Laserfiche WebLink
<br /> <br />Page 2 <br />(Exhibit A – Engineer’s Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />design, professional, and related services to be provided by Engineer and its Consultants; <br />and, on the basis of information furnished by Owner, a summary of allowances for other <br />items and services included within the definition of Total Project Costs. <br />6. Perform or provide the following additional Study and Report Phase tasks or deliverables: <br />Priority Ranking of Proposed Improvements for Phasing Considerations Due to Budget <br />Limitations <br />7. Furnish four review copies of the Report and any other deliverables to Owner within 120 <br />calendar days of the Effective Date and review it with Owner. Within 14 calendar days of <br />receipt, Owner shall submit to Engineer any comments regarding the Report and any other <br />deliverables. <br />8. Revise the Report and any other deliverables in response to Owner’s comments, as <br />appropriate, and furnish four copies of the revised Report and any other deliverables to the <br />Owner within 14 calendar days of receipt of Owner’s comments. <br />B. Engineer’s services under the Study and Report Phase will be considered complete on the date when <br />the revised Report and any other deliverables have been delivered to Owner. <br />A1.02 Preliminary Design Phase <br />A. After acceptance by Owner of the Report and any other deliverables, selection by Owner of a <br />recommended solution and indication of any specific modifications or changes in the scope, extent, <br />character, or design requirements of the Project desired by Owner, and upon written authorization <br />from Owner, Engineer shall: <br />1. Prepare Preliminary Design Phase documents consisting of final design criteria, preliminary <br />drawings, outline specifications, and written descriptions of the Project. <br />2. Provide necessary field surveys and topographic and utility mapping for design purposes. <br />Utility mapping will be based upon information obtained from utility owners. <br />3. Advise Owner if additional reports, data, information, or services of the types described in <br />Exhibit B are necessary and assist Owner in obtaining such reports, data, information, or <br />services. <br />4. Based on the information contained in the Preliminary Design Phase documents, prepare a <br />revised opinion of probable Construction Cost, and assist Owner in collating the various cost <br />categories which comprise Total Project Costs. <br />5. Perform or provide the following additional Preliminary Design Phase tasks or deliverables: <br />[here list any such tasks or deliverables] <br />6. Furnish review copies of the Preliminary Design Phase documents and any other <br />deliverables to Owner within calendar days of authorization to proceed with this phase, <br />and review them with Owner. Within calendar days of receipt, Owner shall submit to <br />Engineer any comments regarding the Preliminary Design Phase documents and any other <br />deliverables.