Laserfiche WebLink
Airport-Moss Annexation Area 6 <br /> <br /> <br /> <br />SECTION III. MUNICIPAL SERVICES <br /> <br />A. Public Works <br /> <br />Sewer – A 18”-diameter sanitary sewer runs along the north side of old Lincolnway West. The <br />pipe has available capacity, but peak flow for the site will need to be provided by the <br />developer for that to be confirmed. <br /> <br />Development of the site requires City approval of a drainage plan that meets the City’s <br />requirement to store all runoff from developed areas. Connection to the City storm sewer is <br />not permitted. <br /> <br />Water - The South Bend Water Works currently has a 12” water main on the south side of old <br />Lincolnway West. <br /> <br />Extensions of or taps into sanitary sewer and water lines shall be governed by state law and <br />the rules and regulations of the South Bend Water Works and Sewer Utility. The Annexation <br />Area may be subject to system development charges for both water and sewer services. <br /> <br />Streets – Annexation would add approximately 390 feet of old Lincolnway West and 330 feet <br />of Moss Road right-of-way to the city limits. A dedication or recorded access easement for <br />Moss Road would formalize access to the annexed property; yet, the Airport Authority may <br />eventually vacate both rights-of-way as the Airport property is fully developed. <br /> <br />Street Lighting – Old Lincolnway West has street lighting, but Moss Road does not. Should <br />any additional street lighting be necessary, it can be provided on wood poles with overhead <br />wiring through an ongoing contract with Indiana Michigan Power. If the owner wishes to <br />construct and dedicate additional street lighting, especially of a decorative nature or with <br />underground wiring, the City may accept it for maintenance and operation, supported by <br />property tax revenue. <br /> <br />Waivers of Annexation – No waivers of right to remonstrate against annexation are in effect <br />for this area. <br /> <br />2022 Actual Budget Report for the Department: <br /> <br />Expenditures: $29,003,569 <br />Miles of Roadway in City: @502 <br />Cost per Mile: @$57,776 <br />New Mileage within Area: @0.14 miles (720 feet) <br />Estimated Maintenance Cost <br /> for Annexation Area per year: @$8,089