Laserfiche WebLink
<br />.°':k <br /> <br />Uttttty Screenlnfl <br />foot corridor from the site's boundary with Blackthorn and to minimize utility costs and <br />public rights-of-way. adverse visualimpacts caused by utilrty structures <br /> and appurtenances. The guidelines are asfiolbws: <br />a. Each newly constructed section of <br />bikepath shall align with the existing <br />1. All- permanent utility lines shat! be <br />bikepath sections on adjacent underground. <br />properties. <br />2. No cesspool, septic tank or sewage <br />Owners are encouraged to wind the <br />b disposal plant shall be erected maintained <br />. <br />path through berms and landscaping. upon any part of Blackthom. The proper <br />The bikepath shall nor run parallel wrth use of constructed or reconstructed <br />the right of way. wetland technology is encouraged for any <br /> on-site stormwater treatment. <br />c. The bikepath shall be seven feet in <br />width <br />3. Transformers shall be grouped with utility <br />. meters where possible and shall be <br />d. Owners are encouraged to construct screened in a manner approved by the <br />addition paths on each Lot. Committee. <br />Owners are encouraged to provide <br />e 4. Utility appurtenances including telephone <br />. <br />bike storage areas on each Srte for pedestals, utility meters, irrigation system <br />empbyees. backflow preventers, transformers, etc. <br /> are not to be visible from adjacent sites, <br /> parking areas, public streets, pedestrian <br /> walkways and bikepaths and shall be <br />S/TE UTILITIES screened in a manner approved by the <br /> Committee. <br />The purpose of the Site Utilities Guidelines is to <br />promote the coordinated development of utilities in <br />1 ~ Blackihron Corporate Center -Development Guidelines 4/193 <br />r.M .«...+~, <br />