My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes- Century Center Water Softener System - DA Dodd
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Quotations/Proposals
>
Opening of Quotes- Century Center Water Softener System - DA Dodd
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2023 2:34:00 PM
Creation date
9/26/2023 2:33:40 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/26/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SECTION 15110 <br />PIPE AND FITTINGS <br />PART 1: GENERAL <br />1.1 PIPING <br />A. Provide all piping in accordance with the following requirements unless otherwise <br />specified. <br />PART 2: PRODUCTS <br />2.1 MATERIAL SCHEDULE <br />A. Potable Water: <br />1. Pipe: <br />a. Seamless Type "L" hard copper, ASTM B88. <br />2. Fittings: <br />a. Wrought copper solder joint fittings, ASTM B61, ANSI B16.22. <br />PART 3: EXECUTION <br />3.1 INSTALLATION <br />A. Run piping straight and direct as possible, parallel with walls, partitions and other piping <br />and neatly spaced for service and insulation. Hang piping at or in ceiling from <br />construction above, as close as possible to bottom of slabs, beams, etc. Maintain <br />maximum headroom at all times. <br />B. Remove all foreign matter from piping before installation. <br />C. Pipe shall be cut accurately to measurements established at building, and shall be worked <br />into place without springing or forcing. <br />D. Arrange piping for maximum accessibility for maintenance and repair, and to properly <br />clear windows, doors and other openings. <br />E. No exposed chrome plated piping shall show tool marks or more than one (1) thread at <br />fittings. Fittings, valves and hangers on chrome plated piping shall be chrome plated. <br />F. Use reducing fittings for changes in pipe sizes. <br />G. Provide dielectric couplings wherever copper and ferrous pressure pipe and/or fittings <br />meet. <br />15110 - 1
The URL can be used to link to this page
Your browser does not support the video tag.