My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes- Century Center Water Softener System - DA Dodd
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Quotations/Proposals
>
Opening of Quotes- Century Center Water Softener System - DA Dodd
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2023 2:34:00 PM
Creation date
9/26/2023 2:33:40 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/26/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3.8 ACCESSIBILITY <br />A. Arrange all work for maximum accessibility for operation, maintenance and repair. Also <br />install clear of windows, doors and other openings. Maintain maximum headroom. <br />3.9 PROTECTION <br />A. Contractor shall be responsible for work and equipment until finally inspected, tested, <br />approved and turned over to Owner. After delivery, and before and after installation, <br />protect work against theft, injury or damage. Carefully store material and equipment <br />received on site which are not immediately installed. Close open ends of work with <br />temporary covers or plugs during construction to prevent entry of foreign material. Any <br />extra cost caused by loss or damage to equipment or systems shall be borne by the <br />Contractor. <br />END OF SECTION <br />15050 - 4
The URL can be used to link to this page
Your browser does not support the video tag.