My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes- Century Center Water Softener System - DA Dodd
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Quotations/Proposals
>
Opening of Quotes- Century Center Water Softener System - DA Dodd
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2023 2:34:00 PM
Creation date
9/26/2023 2:33:40 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/26/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Century Center Water Softener Replacement © Copyright, M/E Design Services <br />South Bend, Indiana September 5, 2023 <br /> <br />SCHEDULE OF VALUES 01370-1 <br />SECTION 01370 SCHEDULE OF VALUES <br /> <br />PART 1 - GENERAL <br /> <br />1.1 SCOPE <br /> <br />A. Provide a complete schedule of values, outlining the costs of various portions of the <br />work. Schedule of values shall be completed on AIA Document G703. This document <br />shall be used as an application and certificate for payment. With prior approval, the <br />Contractor may submit Schedule of Values on an alternative form. <br /> <br />1.2 CONTENT <br /> <br />A. Classification of items shall generally follow the major components, in the order outlined, <br />in the Table of Contents of the Specifications. For each item, provide a separate material <br />and labor cost. Each listed item shall include a proportional amount of subcontractor and <br />prime contractor overhead and profit. <br /> <br />B. The sum of the above values shall equal the total contract amount. These amounts will <br />be updated as the work is completed with each application for payment. <br /> <br />1.3 SUBMITTAL <br /> <br />A. Submit the Schedule of Values within seven (7) days after the contract for the work is <br />awarded. The Contractor shall make any changes requested by the Engineer or Owner <br />within five (5) days after receiving comments. <br /> <br />B. Applications for payment shall be submitted in accordance with General Conditions. <br /> <br />C. If the Engineer or Owner requires, provide substantiating data justifying line item <br />amounts in the Schedule of Values. <br /> <br /> <br />END OF SECTION 01370 <br />
The URL can be used to link to this page
Your browser does not support the video tag.