My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes- Century Center Water Softener System - DA Dodd
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Quotations/Proposals
>
Opening of Quotes- Century Center Water Softener System - DA Dodd
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2023 2:34:00 PM
Creation date
9/26/2023 2:33:40 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/26/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Century Center Water Softener Replacement © Copyright, M/E Design Services <br />South Bend, Indiana September 5, 2023 <br /> <br /> <br />SHOP DRAWINGS AND PRODUCT DATA 01340-2 <br /> <br />A. Make submittals far enough in advance of scheduled dates for installation to provide time <br />required for reviews, for securing necessary approvals, for possible revisions and <br />resubmittals, and for placing orders and securing delivery. <br /> <br />B. In scheduling, allow at least seven (7) working days for review by the Engineer following <br />the Engineer's receipt of the submittal. <br /> <br />END OF SECTION 01340 <br />
The URL can be used to link to this page
Your browser does not support the video tag.