Laserfiche WebLink
South Bend Water Works <br />Erskine Well House Reroof <br />August 16, 2023 <br />pg. 2 of 3 <br /> <br />C. New roof system installation <br />1. Over the concrete deck, adhere the 2 staggered layers of 2” ISO base layer <br />2. Over the 4” base ISO, install tapered ISO to provide positive drainage to gutter <br />3. Adhere EPDM roofing membrane to the tapered ISO <br />4. Flash roof penetrations, gutter apron, gravel stop, and curb walls according to manufacturer’s <br />detail drawings and technical specifications <br />5. Upon completion provide the manufacturer’s twenty-year warranty covering materials and <br />labor. <br />D. Sheet Metal <br />1. Install new 6” shop-fabricated box gutter, approximately 30lf on east side <br />2. Install new 4”x4” box-style downspout <br />a. Terminate downspout at same location as existing PVC drain line <br />3. Install new gravel stop at roof perimeter <br /> <br />CONTRACT PRICE: SEVENTEEN THOUSAND, EIGHT HUNDRED DOLLARS ($17,800.00) <br /> <br />EXCLUSIONS: We specifically exclude masonry work, concrete work, and drainage system work <br />downstream of the downspout outlets <br /> <br />We appreciate your confidence in Dudeck Roofing & Sheet Metal and your consideration of our firm for <br />this project. If you have any questions concerning this proposal, or the scope of our services, please <br />contact us at your convenience. <br /> <br />Sincerely, <br /> <br />Dudeck Roofing & Sheet Metal, Inc. <br />Carl Mankowski <br />Project Manager <br />