Laserfiche WebLink
117‐059B SOUTH WELL FIELD WATER TREATMENT PLANT IMPROVEMENTS ‐ WATERMAIN EXTENSION ‐ CONTRACT BBID OPENING DATE: 08‐22‐2023BID TABULATIONITEM NO. DESCRIPTION QTY. UNIT UNIT PRICE SUBTOTAL UNIT PRICE SUBTOTALUNIT PRICE SUBTOTAL1 CONSTRUCTION ENGINEERING1 LS 27,559.35$  27,559.35$        53,770.00$    53,770.00$        20,000.00$     20,000.00$        2 MOBILIZATION AND DEMOBILIZATION1 LS 79,000.00$  79,000.00$        93,500.00$    93,500.00$        113,500.00$  113,500.00$      3 CLEARING AND GRUBBING2.1 AC 20,180.00$  42,378.00$        14,785.56$    31,049.68$        35,000.00$     73,500.00$        4 TEMPORARY EROSION CONTROL1 LS 31,720.00$  31,720.00$        77,606.36$    77,606.36$        50,000.00$     50,000.00$        5 COMPACTED AGGREGATE, NO. 53776 TON 58.00$          45,008.00$        52.25$            40,546.00$        50.00$             38,800.00$        6 HARD SURFACE REMOVALS1 LS 10,950.00$  10,950.00$        15,990.50$    15,990.50$        20,000.00$     20,000.00$        7 HMA, SURFACE, TYPE B 9.5MM20 TON 446.25$        8,925.00$           623.75$          12,475.00$        425.00$           8,500.00$           8 HMA, BASE, TYPE B 25.0MM54 TON 252.00$        13,608.00$        326.00$          17,604.00$        350.00$           18,900.00$        9 MULCHED SEEDING, R10200 SY 2.90$            29,580.00$        2.41$              24,582.00$        15.00$             153,000.00$      10 REMOVE AND REPLACE CHAIN LINK FENCE AND POSTS50 LF 118.50$        5,925.00$           126.47$          6,323.50$           20.00$             1,000.00$           11 REMOVE AND RESET FARM FIELD TYPE FENCE AND POSTS863 LF 11.80$          10,183.40$        21.27$            18,356.01$        20.00$             17,260.00$        12 JACK AND BORE, 30 IN CASING WITH 20 IN CARRIER40 LF 1,570.00$     62,800.00$        4,891.54$       195,661.60$      1,959.35$       78,374.00$        13 30 IN CASING WITH 20 IN CARRIER, GRANULAR BACKFILL23 LF 550.00$        12,650.00$        821.97$          18,905.31$        2,750.00$       63,250.00$        14 24 IN WATERMAIN, DI, CL 50, TRENCH SPOIL BACKFILL3 LF 1,517.00$     4,551.00$           1,641.90$       4,925.70$           2,500.00$       7,500.00$           15 20 IN WATERMAIN, DI, CL 50, TRENCH SPOIL BACKFILL3599 LF 190.50$        685,609.50$      281.90$          1,014,558.10$   215.00$           773,785.00$      16 20 IN WATERMAIN, DI, CL 50, GRANUALR BACKFILL908 LF 226.00$        205,208.00$      353.88$          321,323.04$      282.00$           256,056.00$      17 16 IN WATERMAIN, DI, CL 50, TRENCH SPOIL BACKFILL9 LF 337.25$        3,035.25$           518.06$          4,662.54$           750.00$           6,750.00$           18 12 IN WATERMAIN, DUCTILE IRON, CL 50, TRENCH SPOIL BACKFILL51 LF 229.50$        11,704.50$        212.77$          10,851.27$        175.00$           8,925.00$           19 6 IN WATERMAIN, DUCTILE IRON, TRENCH SPOIL BACKFILL35 LF 200.00$        7,000.00$           180.66$          6,323.10$           90.00$             3,150.00$           20 FIRE HYDRANT ASSEMBLY5 EA 4,650.00$     23,250.00$        4,434.61$       22,173.05$        12,500.00$     62,500.00$        21 20‐INCH BUTTERFLY VALVE AND BOX W/ JOINT RESTRAINTS10 EA 6,425.00$     64,250.00$        11,382.40$    113,824.00$      12,000.00$     120,000.00$      22 16‐INCH BUTTERFLY VALVE AND BOX W/ JOINT RESTRAINTS1 EA 5,075.00$     5,075.00$           7,762.20$       7,762.20$           8,000.00$       8,000.00$           23 12‐INCH GATE VALVE AND BOX W/ JOINT RESTRAINTS1 EA 5,510.00$     5,510.00$           4,093.83$       4,093.83$           8,000.00$       8,000.00$           24 6‐INCH GATE VALVE AND BOX W/ JOINT RESTRAINTS5 EA 2,060.00$     10,300.00$        1,675.43$       8,377.15$           3,500.00$       17,500.00$        25 24 IN DI MJ 45 DEG. BEND W/ JOINT RESTRAINTS1 EA 4,550.00$     4,550.00$           3,987.71$       3,987.71$           5,000.00$       5,000.00$           26 20 IN DI MJ 22.5 DEG BEND W/ JOINT RESTRAINTS7 EA 3,310.00$     23,170.00$        2,899.35$       20,295.45$        4,000.00$       28,000.00$        27 20 IN DI MJ 11.25 DEG. BEND W/ JOINT RESTRAINTS5 EA 4,650.00$     23,250.00$        3,005.72$       15,028.60$        4,000.00$       20,000.00$        28 20 IN DI MJ REDUCED W/ JOINT RESTRAINTS1 EA 3,400.00$     3,400.00$           2,978.01$       2,978.01$           4,000.00$       4,000.00$           29 24 IN X 20 I DI MJ REDUCER W/ JOINT RESTRAINTS1 EA 4,050.00$     4,050.00$           3,734.36$       3,734.36$           5,000.00$       5,000.00$           30 24 IN X 16 IN DI MJ REDUCER W/ JOINT RESTRAINTS1 EA 3,800.00$     3,800.00$           3,215.85$       3,215.85$           5,000.00$       5,000.00$           31 20 IN X 12 IN DI MJ REDUCER W/ JOINT RESTRAINTS1 EA 2,600.00$     2,600.00$           2,109.38$       2,109.38$           4,000.00$       4,000.00$           32 12 IN DI MJ 22.5 DEG. BEND W/ JOINT RESTRAINTS1 EA 1,500.00$     1,500.00$           981.20$          981.20$              3,000.00$       3,000.00$           33 24 IN DI MJ TEE W/ JOINT RESTRAINTS1 EA 15,000.00$  15,000.00$        6,962.96$       6,962.96$           10,000.00$     10,000.00$        34 20 IN X 12 IN DI MJ TEE W/ JOINT RESTRAINTS1 EA 4,750.00$     4,750.00$           3,567.97$       3,567.97$           8,000.00$       8,000.00$           35 20 IN X 6 IN DI MJ TEE W/ JOINT RESTRAINTS5 EA 4,100.00$     20,500.00$        3,416.87$       17,084.35$        6,000.00$       30,000.00$        36 12 IN DI MJ TEE W/ JOINT RESTRAINTS1 EA 3,950.00$     3,950.00$           1,451.01$       1,451.01$           6,000.00$       6,000.00$           37 12 IN TAPPING SLEEVE AND VALVE1 EA 12,000.00$  12,000.00$        6,371.38$       6,371.38$           15,000.00$     15,000.00$        38 36 IN STORM SEWER, C‐90025 LF 923.00$        23,075.00$        781.58$          19,539.50$        2,750.00$       68,750.00$        39 DEWATERING1LS ‐$              ‐$                    111,070.00$  111,070.00$      80,000.00$     80,000.00$        40 TRENCH STABILIZATION500 LF 47.25$          23,625.00$        30.23$            15,115.00$        32.00$             16,000.00$        41 MAINTAINING TRAFFIC1 LS 22,000.00$  22,000.00$        26,707.20$    26,707.20$        35,000.00$     35,000.00$        BID TOTALS1,597,000.00$   2,385,443.87$   2,271,000.00$   C&E EXCAVATING G.E. MARSHALL HRP CONSTRUCTION